Douglas Webb, On Behalf of: Great Plains Energy - Kansas City Power and Light Co., SPP RE, Segments 1, 3, 5, 6

- 0 - 0

AZPS agrees with the assumption that data at rest within a Control Center is already afforded protections under existing CIP standards (CIP-003-6, CIP-005-5, CIP-007-6, etc.), but respectfully notes that this assumption is outside the scope of the directive set forth by FERC in Order No. 822. Pursuant to FERC Order No. 822, Paragraph 53, the directive targets communication links and data communicated between bulk electric system (“BES”) Control Centers.  (Emphasis Added.) Thus, the directive does not encompass or extend to include data at rest within BES Control Centers. Rather, it is intended to ensure that data in transit between such Control Centers are afforded appropriate protections. To ensure that the scope of the directive is accurately captured, AZPS offers the following revision to the referenced assumption: 

Data at rest within a BES Cyber System is already afforded protections under existing CIP standards and is not within the scope of this directive.  

Vivian Moser, On Behalf of: Vivian Moser, , Segments 1, 3, 5, 6

- 0 - 0

Other Answers

Currently many PI or other Historians that store near real time data are located outside of ESPs since this data, once it is stored on the Historian is not used for operations. However some entities may use data stored on Histroians as a feedback loop into their control systems. In these specific siturations the data "at rest" on the Historians may have an operational impact. Data that resides within an entities EMS is constantly being updated, the "data points" exist in memory and store data values in these data points are constantly being updated. If data wishes to be preserved it is written to a histroian before being overwirtten. 

Richard Kinas, On Behalf of: Richard Kinas, , Segments 3, 5

- 0 - 0

Entergy/NERC Compliance, Segment(s) 1, 5, 3/1/2017

- 0 - 0

Aaron Ghodooshim, On Behalf of: FirstEnergy - FirstEnergy Corporation, , Segments 1, 3, 4

- 0 - 0

Data needed for the operation of the BES is already protected and exists only to transmit operational controls which are transient in nature.

DTE Energy - DTE Electric, Segment(s) 5, 4, 3, 2/27/2017

- 0 - 0

Glen Farmer, On Behalf of: Avista - Avista Corporation, , Segments 1, 3, 5

- 0 - 0

The NSRF agrees with the SDT.  NERC has already defined Operating Reliability Data (ORD) and  recipients are required to sign an ORD Confidentiality Agreement, which should elimate the need for a requirement.  Additionally, NERC Standards of Conduct as well as most FERC approved tariffs have provisions for protection of sensitive data.

MRO NSRF, Segment(s) 3, 4, 5, 6, 1, 2, 1/4/2017

- 0 - 0

SRP agrees with the SDT assertions:

  • CIP-003:  Identifies all security management controls used by the entity to address high, medium, and low impact BES Cyber Systems (BCS).

  • CIP-004:  R4 Part 4.1 requires entities to develop processes to control not only electronic and physical access, it also requires processes to control access to designated BES Cyber System Information storage, otherwise known as repositories, as determined in CIP-011.  These repositories are where “referenced data” would exist “at rest”.

  • CIP-005:  The entirety of the Standard is based on specifying a controlled Electronic Security Perimeter (ESP) in supporting of protecting BCS (including information “at rest” within the BCS).

  • CIP-006:  In the same manner as CIP-005 and ESP protections, the physical protections afforded by CIP-006 protect the BCS from unauthorized individuals “walking-up” to components of the BCS where “at rest” “referenced data” may exist.

  • CIP-007:  The entirety of the Standard is based on specifying technical, operational, and procedural controls to protect the BCS (including the information “at rest” within the BCS).

  • CIP-010:  The change and configuration management controls prevent and detect unauthorized changes to the BCS (including information “at rest” within the BCS).  Vulnerability assessment requirements are also in support of protecting the BCS (including information “at rest” within the BCS).

  • CIP-011:  R1 requires the identification of BES Cyber System Information.  An article of acceptable evidence included in the measures of R1 is the identification of “repositories or electronic and physical locations designated for housing BES Cyber System Information”.  These identified locations are used as input for CIP-004 R4 Part 4.1 (in order to verify access controls).

Lona Calderon, On Behalf of: Salt River Project, WECC, Segments 1, 3, 5, 6

- 0 - 0

Mike Smith, On Behalf of: Manitoba Hydro , , Segments 1, 3, 5, 6

- 0 - 0

The same information that is two seconds old in a real-time SCADA system may be retained for five years in a corporate (non-control) data historian. NERC CIP-002-5.1 scopes the applicability of the protections on assets which have a real-time impact on reliable BES operations. As such, any information utilized by real-time systems for a fifteen minute time horizon are already afforded protections in CIP-002 through 011.

While data at rest may have impacts on planning or historical analysis, it cannot be reasonably inferred to have a fifteen minute impact on reliable operations. Many multi-purpose Operating Systems support encrypted file systems. As such, any mandate for data at rest protections would be more appropriately scoped in CIP-011 and applied to electronic repositories of BES Cyber System information.

The Confidentiality, Integrity and Availability triad is commonly utilized in designing effective controls for information systems. Regulatory frameworks which provide protections for data at rest are focused on confidentiality of financial transactions and/or Personally Identifiable Information. Power control systems have unique characteristics which make Availability and Integrity paramount.

Encryption for data at rest inherently is focused on making access to information more restricted. This inherently creates potential to adversely impact Availability, which may be counter-productive to reliable BES operations.

Tennessee Valley Authority, Segment(s) 1, 3, 5, 6, 9/1/2016

- 0 - 0

Supporting APPA comments

Seattle City Light Ballot Body, Segment(s) 1, 4, 6, 5, 3, 12/2/2016

- 0 - 0

Andrew Gallo, On Behalf of: Andrew Gallo, , Segments 1, 3, 4, 5, 6

- 0 - 0

We agree that existing CIP standards protections address the referenced data at rest.

The referenced data is covered in the cited Standards. Consider that real-time SCADA data performance may be impacted by disk encryption.

Con Edison, Segment(s) 1, 3, 5, 6, 0, 6/24/2016

- 0 - 0

Duke Energy agrees with the assertion that the referenced data is already afforded protections under existing CIP standards.

Duke Energy , Segment(s) 1, 5, 6, 4/10/2014

- 0 - 0

Preston Walker, On Behalf of: PJM Interconnection, L.L.C., SERC, RF, Segments 2

- 0 - 0

Lan Nguyen, On Behalf of: CenterPoint Energy Houston Electric, LLC, Texas RE, Segments 1

- 0 - 0

The data is resting on systems that are protected by CIP controls.

Jeff Johnson, On Behalf of: Sempra - San Diego Gas and Electric, WECC, Segments 1, 2, 3, 4, 5, 6, 7, 8

- 0 - 0

Lauren Price, On Behalf of: Lauren Price, , Segments 1

- 0 - 0

NRG agrees with the rationale because, the data at rest is not being used in the real-time operation of the Bulk Electric System i.e. the 15 minute impact process.  Also, the CIP Standards provide the appropriate protection for data integrity and confidentiality for in-scope systems.

Kara White, On Behalf of: NRG - NRG Energy, Inc., FRCC, MRO, WECC, Texas RE, NPCC, SERC, SPP RE, RF, Segments 3, 4, 5, 6

- 0 - 0

Laura Nelson, On Behalf of: Laura Nelson, , Segments 1

- 0 - 0

The referenced data while at rest is covered in the cited Standards. Consider that real-time SCADA data performance may be impacted by disk encryption.

Brian Evans-Mongeon, On Behalf of: Utility Services, Inc., , Segments 4

- 1 - 0

Once referenced data has been received by a BES Cyber Asset it is then protected under the CIP Standards. There is no need to protect stale data.

Jason Snodgrass, On Behalf of: Jason Snodgrass, , Segments 1

- 0 - 0

Texas RE requests the SDT consider defining the term “sensitive BES data”, which could include ICCP, Historian, and backup data, since a goal of this project should be to provide clear requirements for identifying and protecting Control Centers required for reliable operation.  The undefined term, sensitive BES data, is already being used among several non-CIP standards and defining the term would encourage consistency and lessen confusion.

Rachel Coyne, On Behalf of: Texas Reliability Entity, Inc., , Segments 10

- 0 - 0

Once referenced data has been received by a BES Cyber Asset it is then protected under the CIP Standards. There is no need to protect stale data.

Guy Andrews, On Behalf of: Guy Andrews, , Segments 3, 4

- 0 - 0

Jamie Monette, On Behalf of: Allete - Minnesota Power, Inc., , Segments 1

- 0 - 0

AEP contends that CIP standards, specifically CIP-003,005,006, 007, 009, 010, and 011 concentrate on BCS, EACMS, PCA, PACS devices and data resident on them.

Aaron Austin, On Behalf of: Aaron Austin, , Segments 3, 5

- 0 - 0

Anton Vu, On Behalf of: Los Angeles Department of Water and Power, , Segments 1, 3, 5, 6

- 0 - 0

PSEG REs, Segment(s) 5, 6, 3, 1, 3/6/2017

- 3 - 0

Si Truc Phan, On Behalf of: Hydro-Qu?bec TransEnergie, NPCC, Segments 1

- 0 - 0

ERCOT agrees with the SDT’s assertion. While at rest, the data required for reliable operation resides within existing BCS data and is afforded protections under existing CIP Standards. Much of the referenced data has a limited time of need for protection and can be made public after a certain number of days. Requiring additional protections of data at rest may not be necessary and due to the limited time of sensitivity, may not have a positive cost benefit. 

Elizabeth Axson, On Behalf of: Elizabeth Axson, , Segments 2

- 0 - 0

 

In use and transport is the highest risk.  Exisiting controls are sufficient.

 

Joe Tarantino, On Behalf of: Sacramento Municipal Utility District - WECC - Segments 1, 3, 4, 5, 6

- 0 - 0

BPA agrees with the SDT assertion. BPA believes the referenced data is already afforded protections at rest under existing standards.

Aaron Cavanaugh, On Behalf of: Bonneville Power Administration, WECC, Segments 1, 3, 5, 6

- 0 - 0

Is the operational data a subset of all sensitive data?  I would offer that certain modeling update information would not fall under this framework and could have negative impacts on the BES (e.g. ratings changes, configuration/outage changes, etc.).  If that is captured in the scope of operational data, then ok but I infer from the presentation of the information that real-time variable data is what is being targeted here.

Gerry Adamski, On Behalf of: Gerry Adamski, , Segments 5

- 0 - 0

David Gordon, On Behalf of: David Gordon, , Segments 5

- 0 - 0

Xcel Energy agrees with the rationale that the data is perishable and is already afforded protection under existing CIP standards. Any data that is at rest does not meet the 15-minute impact criteria for adversely impacting real-time operations.

Amy Casuscelli, On Behalf of: Xcel Energy, Inc. - MRO, WECC, SPP RE - Segments 1, 3, 5, 6

- 0 - 0

Existing CIP-011 requirements adequately identify and protect BES Cyber System information at rest.

Candace Morakinyo, On Behalf of: WEC Energy Group, Inc., MRO, RF, Segments 3, 4, 5

- 0 - 0

Access to the host systems is strictly controlled via the current CIP standards and requirements.

Deborah VanDeventer, On Behalf of: Edison International - Southern California Edison Company, WECC, Segments 1, 3, 5, 6

- 0 - 0

Basin Electric Power Cooperative agrees NERC has already defined Operating Reliability Data and  recipients are required to sign a Confidentiality Agreement, which should elimate the need for a requirement.  In addition, Basin Electric agrees existing CIP standards provide protection for this data at rest.

Mike Kraft, On Behalf of: Mike Kraft, , Segments 1, 3, 5, 6

- 0 - 0

Yes, Southern Company agrees with the SDT’s assertion.  Real-time reliability data used by Control Centers is only sensitive within a short time window; it becomes perishable quickly and the need to maintain protections for that data diminishes over time.   For data “at rest”, Southern Company views the language in the FERC Order, specifically paragraph 54, intending to address a reliability gap to protect communications between Controls Centers from “data manipulation type attacks” and “eavesdropping attacks”.  The existing controls applied in accordance with CIP-011 and CIP-006-6 R1.10 sufficiently address protection of sensitive BES data “at rest” and in logical transit within an ESP, respectively.  Additionally, the existing controls applied in accordance with CIP-004 (Access Management), CIP-005 (ESPs, encryption, multi-factor authentication), and CIP-007 (system security controls, account management) provide by extension added layers of security to protect data “at rest.”

Brandon Cain, On Behalf of: Southern Company - Southern Company Services, Inc., SERC, Segments NA - Not Applicable

- 0 - 0

See attachment Q1

Daniel Gacek, On Behalf of: Exelon, , Segments 1, 3, 5, 6

COMM Network - Exelon Comments - 3.13.17.docx

- 0 - 0

Reclamation recommends removing the phrase “is perishable, and has a diminished need for protection over time.” Reclamation agrees that data at rest is already afforded protections under other applicable CIP standards. Reclamation disagrees that all data at rest is perishable and has a diminished need for protection over time.

Wendy Center, On Behalf of: U.S. Bureau of Reclamation, , Segments 1, 5

- 0 - 0

AECI agrees that the referenced data is already afforded protections at rest under the current CIP Standards.  Operational Reliability Data becomes stale over time and has a diminished need for protection.

Mark Riley, On Behalf of: Associated Electric Cooperative, Inc., , Segments 1, 3, 5, 6

- 0 - 0

The referenced data is covered in the cited Standards. Consider that real-time SCADA data performance may be impacted by disk encryption.

RSC no Dominion, Segment(s) 1, 0, 2, 4, 5, 6, 7, 3, 3/13/2017

- 0 - 0

The SPP Standards Review Group agrees with the rationale because, the data at rest is not being used in the Real-time operation of the Bulk Electric System i.e. the 15 minute impact process. Also, the CIP Standards provide the appropriate protection for data integrity and confidentiality for in scope systems.

SPP Standards Review Group, Segment(s) , 3/13/2017

- 0 - 0

Yes, much of the critical data between control centers is only valid for that immediate time period, control data hours or days old only has historical value.

sean erickson, On Behalf of: Western Area Power Administration, , Segments 1, 6

- 0 - 0

  • NERC has already defined Operating Reliability Data (ORD).  Additionally, recipients are required to sign an ORD Confidentiality Agreement, which should elimate the need for a requirement.

Charles Yeung, On Behalf of: Southwest Power Pool, Inc. (RTO), , Segments 2

- 0 - 0

Tacoma supports the comments of Utility Services, Inc

Marc Donaldson, On Behalf of: Tacoma Public Utilities (Tacoma, WA), , Segments 1, 3, 4, 5, 6

- 0 - 0

Hot Answers

Not Applicable

Douglas Webb, On Behalf of: Great Plains Energy - Kansas City Power and Light Co., SPP RE, Segments 1, 3, 5, 6

- 0 - 0

AZPS respectfully asserts that the SDT’s assertion in Question 1 is beyond the scope of the directive set forth in Order 822 at paragraph 53. Further, AZPS is concerned that the assumption paints all data retained with BES Control Centers with too “broad of a brush stroke.” This is particularly evident in the SDT’s assumption that all data within Control Centers is perishable and has a diminished need for protection as such statements appear to be considering the “freshness” of real-time data only.  

AZPS notes that the data contained and retained within BES Control Centers includes more than real-time data. In particular, BES Control Centers often also retain data related to the operations and long-term planning time horizons. Such data, which is outside of data indicative of real-time status, may not age and become perishable in the same manner or time period as data communicating real-time status. Because the verbiage utilized in the assumption is extremely broad and does not clearly distinguish the or otherwise narrow the specific data to which the assumption applies, AZPS disagrees with the assumption set forth by the SDT as such assumption has the effect of “broad brushing” all data communicated between and “at rest” within BES Control Centers with the same importance and usability when, in fact, such data has varying levels of criticality, usability, confidentiality, etc.  

AZPS reiterates that it agrees with the SDT that the risk associated with data “at rest” within Control Centers is negligible given the applicability of existing CIP reliability standards to such data, but, for the reasons set forth above, must respectfully disagree with the assumption and re-urge the SDT to adopt the proposed revisions recommended in response to Question 1.

Vivian Moser, On Behalf of: Vivian Moser, , Segments 1, 3, 5, 6

- 0 - 0

Other Answers

Richard Kinas, On Behalf of: Richard Kinas, , Segments 3, 5

- 0 - 0

Entergy/NERC Compliance, Segment(s) 1, 5, 3/1/2017

- 0 - 0

Aaron Ghodooshim, On Behalf of: FirstEnergy - FirstEnergy Corporation, , Segments 1, 3, 4

- 0 - 0

n/a

DTE Energy - DTE Electric, Segment(s) 5, 4, 3, 2/27/2017

- 0 - 0

Glen Farmer, On Behalf of: Avista - Avista Corporation, , Segments 1, 3, 5

- 0 - 0

See comments for Question No. 1

MRO NSRF, Segment(s) 3, 4, 5, 6, 1, 2, 1/4/2017

- 0 - 0

SRP agrees with the SDT’s assertion in Question 1.

Lona Calderon, On Behalf of: Salt River Project, WECC, Segments 1, 3, 5, 6

- 0 - 0

Mike Smith, On Behalf of: Manitoba Hydro , , Segments 1, 3, 5, 6

- 0 - 0

See comment above.

Tennessee Valley Authority, Segment(s) 1, 3, 5, 6, 9/1/2016

- 0 - 0

Supporting APPA comments

Seattle City Light Ballot Body, Segment(s) 1, 4, 6, 5, 3, 12/2/2016

- 0 - 0

N/A

Andrew Gallo, On Behalf of: Andrew Gallo, , Segments 1, 3, 4, 5, 6

- 0 - 0

Con Edison, Segment(s) 1, 3, 5, 6, 0, 6/24/2016

- 0 - 0

Duke Energy , Segment(s) 1, 5, 6, 4/10/2014

- 0 - 0

Preston Walker, On Behalf of: PJM Interconnection, L.L.C., SERC, RF, Segments 2

- 0 - 0

N/A

Lan Nguyen, On Behalf of: CenterPoint Energy Houston Electric, LLC, Texas RE, Segments 1

- 0 - 0

N/A

Jeff Johnson, On Behalf of: Sempra - San Diego Gas and Electric, WECC, Segments 1, 2, 3, 4, 5, 6, 7, 8

- 0 - 0

Lauren Price, On Behalf of: Lauren Price, , Segments 1

- 0 - 0

N/A

Kara White, On Behalf of: NRG - NRG Energy, Inc., FRCC, MRO, WECC, Texas RE, NPCC, SERC, SPP RE, RF, Segments 3, 4, 5, 6

- 0 - 0

Laura Nelson, On Behalf of: Laura Nelson, , Segments 1

- 0 - 0

Brian Evans-Mongeon, On Behalf of: Utility Services, Inc., , Segments 4

- 0 - 0

Jason Snodgrass, On Behalf of: Jason Snodgrass, , Segments 1

- 0 - 0

Please see Texas RE’s response to #1. 

Rachel Coyne, On Behalf of: Texas Reliability Entity, Inc., , Segments 10

- 0 - 0

Guy Andrews, On Behalf of: Guy Andrews, , Segments 3, 4

- 0 - 0

Jamie Monette, On Behalf of: Allete - Minnesota Power, Inc., , Segments 1

- 0 - 0

The CIP standards do not necessarily apply to Cyber Assets that perform operating day ahead activities or other comparable functions that may be capable of impacting the BES beyond the 15 minute threshold.

Aaron Austin, On Behalf of: Aaron Austin, , Segments 3, 5

- 0 - 0

Anton Vu, On Behalf of: Los Angeles Department of Water and Power, , Segments 1, 3, 5, 6

- 0 - 0

N/A

PSEG REs, Segment(s) 5, 6, 3, 1, 3/6/2017

- 3 - 0

HQT’s understanding of the objectives behind the drafting of CIP-012 is to protect communication links and therefore sensitive bulk electric system data exchanged between bulk electric system Control Centers in a manner that is appropriately tailored to address the risks posed to the BES by the assets being protected (i.e., high, medium, or low impact). Why are the security objectives are silent regarding avaibility?

Protection of data at rest is (currently) not part of the objectives of CIP-012. Furthermore, our understanding of the different CIPs is that it does not fully address the security objectives of confidentiality and integrity of data at rest. CIP-005 is about establishing enclaves to protect the cybet assets, CIP-007 about the protection of the Cybe assets, CIP-011 to prevent unauthorized access (Guidelines and Technical Basis mention confidentiality but not integrity).

Furthermore, the princips of CIA (Confidentiality Integrity Avaibility) may be implied but they are not precise enough to ensure that the objectives are meet in the existing CIP standards (CIP-003, 005, 007, 011 etc.). The concepts of confidentiality are treated in a certain ways but the concepts of integrity are not explicit.

The objectifs of CIP-012 could say ”Develop a security plan to ensure the confidentiality, integrity of data at rest and in-transit between Control Centers, both inter-entity and intra-entity”

Si Truc Phan, On Behalf of: Hydro-Qu?bec TransEnergie, NPCC, Segments 1

- 0 - 0

Elizabeth Axson, On Behalf of: Elizabeth Axson, , Segments 2

- 0 - 0

Joe Tarantino, On Behalf of: Sacramento Municipal Utility District - WECC - Segments 1, 3, 4, 5, 6

- 0 - 0

NA

Aaron Cavanaugh, On Behalf of: Bonneville Power Administration, WECC, Segments 1, 3, 5, 6

- 0 - 0

See above

Gerry Adamski, On Behalf of: Gerry Adamski, , Segments 5

- 0 - 0

David Gordon, On Behalf of: David Gordon, , Segments 5

- 0 - 0

Amy Casuscelli, On Behalf of: Xcel Energy, Inc. - MRO, WECC, SPP RE - Segments 1, 3, 5, 6

- 0 - 0

n/a

Candace Morakinyo, On Behalf of: WEC Energy Group, Inc., MRO, RF, Segments 3, 4, 5

- 0 - 0

Deborah VanDeventer, On Behalf of: Edison International - Southern California Edison Company, WECC, Segments 1, 3, 5, 6

- 0 - 0

Mike Kraft, On Behalf of: Mike Kraft, , Segments 1, 3, 5, 6

- 0 - 0

N/A

Brandon Cain, On Behalf of: Southern Company - Southern Company Services, Inc., SERC, Segments NA - Not Applicable

- 0 - 0

See attachment Q1

Daniel Gacek, On Behalf of: Exelon, , Segments 1, 3, 5, 6

- 0 - 0

Reclamation recommends removing the phrase “is perishable, and has a diminished need for protection over time.” Reclamation agrees that data at rest is already afforded protections under other applicable CIP standards. Reclamation disagrees that data all at rest is perishable and has a diminished need for protection over time. Reclamation recommends that each entity be responsible to determine the value of its data at rest, if and when the data at rest is perishable, and the necessary level of protection. As examples, some data between control centers may include sensitive data such as configuration information of the network or relay protection systems. If the data that is transferred is deemed to be sensitive, then the associated data at rest may also be sensitive.

Wendy Center, On Behalf of: U.S. Bureau of Reclamation, , Segments 1, 5

- 0 - 0

Mark Riley, On Behalf of: Associated Electric Cooperative, Inc., , Segments 1, 3, 5, 6

- 0 - 0

RSC no Dominion, Segment(s) 1, 0, 2, 4, 5, 6, 7, 3, 3/13/2017

- 0 - 0

SPP Standards Review Group, Segment(s) , 3/13/2017

- 0 - 0

sean erickson, On Behalf of: Western Area Power Administration, , Segments 1, 6

- 0 - 0

Charles Yeung, On Behalf of: Southwest Power Pool, Inc. (RTO), , Segments 2

- 0 - 0

No comment

Marc Donaldson, On Behalf of: Tacoma Public Utilities (Tacoma, WA), , Segments 1, 3, 4, 5, 6

- 0 - 0

Hot Answers

The case can be made that a requirement to identify, or a definition of, “sensitive BES data” Is not necessary as it is already identified.   

In consideration of Question 3, we ask another question. The CIP Standards exist to address security risks of the BES to ensure reliability.  In order to do that we protect the systems and infrastructure needed to perform the tasks or functions required for BES reliability operating services.  Those systems predominately include the data necessary for these functions.  “Are the CIP Standards meant to secure more than the data necessary to perform reliability tasks?  And what gaps, if any, are not addressed or clearly identified in the data deemed necessary to perform reliability obligations in IRO-010-2?” 

To protect BES reliability, entities are required under the CIP Standards to protect operational data and BES Cyber Systems Information. This is the same data identified as Real-time monitoring and Real-time Assessment data in IRO-010-2 R1 and TOP-003-3 R1 and R2.  Thus the protections may need to be extended to consider Operational Planning Analysis or those data elements that are relevant to promulgate an attack with a longer shelf life of applicability or use.

Douglas Webb, On Behalf of: Great Plains Energy - Kansas City Power and Light Co., SPP RE, Segments 1, 3, 5, 6

- 0 - 0

AZPS disagrees with the SDT’s interpretation and asserions relative to broad applicability of the data required for reliable operation under TOP-003-3 and IRO-010-2 to the data contemplated in the directive set forth in Order 822 at paragraph 53. AZPS notes that both TOP-003-3 and IRO-010-2 and the data associated therewith are applicable to the operations planning time horizon and not the real-time operations time horizon. Given the focus of the FERC directive on data in transit between Control Centers during real-time operations, AZPS recommends that the SDT re-evaluate its interpretation as set forth above and assess the need for development of a definition of “sensitive BES data.” To scope such definition, AZPS recommends that the SDT reference the definition of Real-Time Assessment in the Glossary of Terms, and those reliability standards that address the performance of Real-Time Assessments and monitoring to identify the data communicated between Control Centers in real-time for performance of such assessments and monitoring. 

Further, since each entity has discretion to determine the confidential nature of its data, without a definition, different data could be assigned different levels of sensitivity and confidentiality by different entities. This would create unnecessary ambiguity and complexity for receiving entities – especially where such entity has multiple adjacent Balancing Authorities, Transmission Operators, Generation Operators, etc.  AZPS respectfully asserts that, to eliminate inconsistencies and ensure that the real-time data that is critical to reliable operations is uniformly identified and protected amongst all interconnected entities, a definition is necessary.

Finally, AZPS notes that the Guidelines and Technical Basis is not enforceable in finding an entity out of compliance and should be available for supplemental information only. Therefore, while AZPS is not opposed to the provision of guidance, development of a definition for sensitive BES data to be included in the Glossary of Terms is recommended. 

Vivian Moser, On Behalf of: Vivian Moser, , Segments 1, 3, 5, 6

- 0 - 0

Other Answers

The data for Operational Planning Analysis does not address the data that is used to perform other required functions such as calculating ACE for a BA. Data Required for reliable operation should include Data used during the performance of any Reliability Related Task (RRT) as defined with the entities training program under requirement PER-005-2 R1.1

Richard Kinas, On Behalf of: Richard Kinas, , Segments 3, 5

- 0 - 0

Entergy/NERC Compliance, Segment(s) 1, 5, 3/1/2017

- 0 - 0

Aaron Ghodooshim, On Behalf of: FirstEnergy - FirstEnergy Corporation, , Segments 1, 3, 4

- 0 - 0

DTE Energy - DTE Electric, Segment(s) 5, 4, 3, 2/27/2017

- 0 - 0

Glen Farmer, On Behalf of: Avista - Avista Corporation, , Segments 1, 3, 5

- 0 - 0

MRO NSRF, Segment(s) 3, 4, 5, 6, 1, 2, 1/4/2017

- 0 - 0

SRP agrees that IRO-010-2 is the correct standard to identify “sensitive BES data”; however, SRP believes R3 should be used to determine what an entity is actually sending to the RC, as opposed to R1 (what the RC is asking for).  This benefits entities with fewer functional registrations by eliminating data sources that are not applicable to them.

SRP agrees that TOP-003-3 R1 and R2 can be used to identify “sensitive BES data”.

TOP-003-3:  SRP provides the same evidence for both R1 and R2:

  • R1:  Data necessary for Operational Planning, Real-time monitoring, and Real-time Assessments.

  • R2:  Data necessary for analysis functions and Real-time monitoring.

SRP would like to see examples that include sensitive BES data transmitted between primary and back-up Control Centers. SRP also requests clarification on requirements for entities that own their communications network and protection of data transferred within the same private network. 

    Lona Calderon, On Behalf of: Salt River Project, WECC, Segments 1, 3, 5, 6

    - 0 - 0

    Mike Smith, On Behalf of: Manitoba Hydro , , Segments 1, 3, 5, 6

    - 0 - 0

    Tennessee Valley Authority, Segment(s) 1, 3, 5, 6, 9/1/2016

    - 0 - 0

    Supporting APPA comments

    Seattle City Light Ballot Body, Segment(s) 1, 4, 6, 5, 3, 12/2/2016

    - 0 - 0

    The SDT should refine references to make it clear IRO-010 and TOP-003 data is limited to only data transmitted between control centers, because data between field assets and the control center is not in-scope. Also, this should not be in the Guidelines and Technical Basis section of a Standard because it would not be enforceable.

    Andrew Gallo, On Behalf of: Andrew Gallo, , Segments 1, 3, 4, 5, 6

    - 0 - 0

    We agree using TOP-003 and IRO-010 Standards to identify data but we believe Operational Planning Analyses data is out of scope.

    Explicitly stating what data each entity requires in a Standard would not be beneficial. Currently each RC and TOP defines their own requirements for the data that they need from others (per TOP-003-3 and IRO-010). We are concerned that multiple definitions may lead to conflict.

    Con Edison, Segment(s) 1, 3, 5, 6, 0, 6/24/2016

    - 0 - 0

    Duke Energy does not agree that a definition of “sensitive BES data” is not necessary. The question above alludes to expectations for the RC/BA/TOP in IRO-010-2 and TOP-003-3, but the reference fails to point out how this would apply to other functions such as the GOP. It is not enough to refer to the RC/BA/TOP data requirements if the standard is also applicable to other functions unless the applicability of data required from the GO/GOP/TO/DP by the RC/BA/TOP is limited.

    Duke Energy , Segment(s) 1, 5, 6, 4/10/2014

    - 0 - 0

    While PJM does agree with the draft language, we feel that it could be tied closely to the CIP-002 assessment (<15 minute impact).  For entities that look to the guidance section and chose to use the IRO and TOP standards as a starting point, it should be more apparent that only data used for real-time reliability purposes, that fall within the 15 minute impact, would need to be protected per this standard.  It could be mis-interpreted that the guidance suggests protecting all data included in the IRO and TOP standards, even data that may not fall into this real-time category.

    Preston Walker, On Behalf of: PJM Interconnection, L.L.C., SERC, RF, Segments 2

    - 0 - 0

    CenterPoint Energy believes the “data required for reliable operation” identified in TOP-003-3 and IRO-010-2 is too broad and goes beyond the scope of “sensitive bulk electric system data” that should be protected.  For example, portions of the data requested in TOP-003-3 and IRO-010-2 could be non-BES data that may only serve a purpose under certain system configurations or conditions.   Data specified as necessary for Operational Planning Analyses is based in large part on projections and forecasts which should not fall under the label of “sensitive bulk electric system data.”  For example, outages, Facility Ratings, equipment limitations, and Protection System degradation use data exchange capabilities (phone systems, email, web based portals, FTP exchange, RTU, etc.) which may go beyond ‘communication links’ between Control Centers and should remain flexible enough to allow for normal and abnormal Real-time system conditions and what Operating Plans are being implemented at that time. 

    CenterPoint Energy recommends that the drafting team narrow the scope to a subset of the data identified in TOP-003-3 and IRO-010-2.  CenterPoint Energy also recommends the drafting team develop criteria in the requirement language for determining what “sensitive bulk electric system data” should be separate from the holistic list of data necessary for functions described in the latest revisions of TOP and IRO Standards.  CenterPoint Energy does not believe referencing the TOP-003-3 and IRO-010-2 standards in the requirement language is necessary as this may become problematic in the future if the language in these standards changes or becomes obsolete. 

    Lan Nguyen, On Behalf of: CenterPoint Energy Houston Electric, LLC, Texas RE, Segments 1

    - 0 - 0

    Jeff Johnson, On Behalf of: Sempra - San Diego Gas and Electric, WECC, Segments 1, 2, 3, 4, 5, 6, 7, 8

    - 0 - 0

    Lauren Price, On Behalf of: Lauren Price, , Segments 1

    - 0 - 0

    NRG suggests that the drafting team develop a definition for the term “sensitive BES data” - something similar in effect to the term “BES Cyber Systems Information” defined for CIP-011. Also, NRG recommends the definition for the term “sensitive BES data” include language addressing the 15 minute impact operational criteria. 

    NRG’s proposed language for “sensitive BES data” definition: “Data if rendered unavailable, degraded, or misused within 15 minutes would adversely impact the Real-Time operation of the Bulk Electric System.”

    Our interpretation of the proposed language is that the drafting team has a concern for the protection of the data being transmitted. Since the data being transmitted can’t be broken down and identified as sensitive data or non-sensitive data, the recommendation of developing a definition seems to be the safest path. Additionally, NRG recommends that the drafting team review the term “reliable operation” in the NERC Glossary of Terms. Also, if the term is used in the Requirement, NRG recommends using the term’s definition out of the glossary. This is a defined term and we propose that the term should be capitalized. NRG seeks to understand, with this being a defined term, does this change the drafting team’s intent for the use of this term?

    Kara White, On Behalf of: NRG - NRG Energy, Inc., FRCC, MRO, WECC, Texas RE, NPCC, SERC, SPP RE, RF, Segments 3, 4, 5, 6

    - 0 - 0

    Responsible Entities are audited to the requirement language and cannot be held to the language in the GTB. If there is a desired outcome from a requirement, it should be stated in the requirement language; the GTB should not be used to imply the inherent meaning of a requirement. If the SDT's intent is to rely on documentation developed in TOP-003, the requirement should state that. If the SDT's intent is to rely on “a list of data and information needed by the Reliability Coordinator to support Operational Planning Analyses,” etc., the requirement should state that. The GTB should provide only additional guidance.

    Laura Nelson, On Behalf of: Laura Nelson, , Segments 1

    - 0 - 0

    We agree with the basic approach of using TOP-003 and IRO-010 Standards to identify this data but needs to be limited to real time data. We believe TOP-003 and IRO-010 include data that is not “real time” so would be outside this document’s scope. An example of data which is out of scope includes data used for Operational Planning Analyses. 

    Brian Evans-Mongeon, On Behalf of: Utility Services, Inc., , Segments 4

    - 1 - 0

    TOP-03-3 R1.1 requires a list of data and information needed, including non-BES data and external network data deemed necessary by the Transmission Operator. Because the requirement is vague using the verbiage such as “information needed” and “non-BES data” it may be difficult or impractical to protect the various methods used to communicate information or non-BES data. Methods of communication could include voice, email, text messages, or faxes.  

    Jason Snodgrass, On Behalf of: Jason Snodgrass, , Segments 1

    - 0 - 0

    Please see Texas RE’s response to #1. 

    Rachel Coyne, On Behalf of: Texas Reliability Entity, Inc., , Segments 10

    - 0 - 0

    TOP-03-3 R1.1 requires a list of data and information needed, including non-BES data and external network data deemed necessary by the Transmission Operator. Because the requirement is vague using the verbiage such as “information needed” and “non-BES data” it may be difficult or impractical to protect the various methods used to communicate information or non-BES data. Methods of communication could include voice, email, text messages, or faxes.  

    Guy Andrews, On Behalf of: Guy Andrews, , Segments 3, 4

    - 0 - 0

    Jamie Monette, On Behalf of: Allete - Minnesota Power, Inc., , Segments 1

    - 0 - 0

    AEP believes trying to connect multiple requirements to dissimiliar standards or standard families poses a huge risk in that altering the “origin” standard requirement without also modifying the “destination” requirement may result in a violation.Written guidelines provided by NERC explaining what “sesntive BES data” means would be helpful since the terms can be interpreted in various ways by each RC, BA and TOP.

    Aaron Austin, On Behalf of: Aaron Austin, , Segments 3, 5

    - 0 - 0

    Anton Vu, On Behalf of: Los Angeles Department of Water and Power, , Segments 1, 3, 5, 6

    - 0 - 0

    PSEG REs, Segment(s) 5, 6, 3, 1, 3/6/2017

    - 3 - 0

    HQT agree, but the reference should be clearly stated. Since IRO-010-2 and TOP-003-3 are future enforceable reliability Standards, the SDT should evaluate the risk of those not being endorsed. If this should happen, the basis would be absent of CIP-012. Also, with the present suggestion, CIP standard would be used to define controls of IRO and TOP standards. This situation could cause an audit gap: the CIP auditors would not have requirement from IRO or TOP to audit against and IRO and TOP auditors would not security requirement to audit against.

    Si Truc Phan, On Behalf of: Hydro-Qu?bec TransEnergie, NPCC, Segments 1

    - 0 - 0

    ERCOT does not agree with the approach of putting this in the Guidelines and Technical Basis section of a Standard since it is not enforceable or recognized by some ERO compliance staff.

     

    While the scoping of IRO-010 and TOP-003 may be too broad, having clear criteria will assist in clear implementation and understanding among the entities required to comply with the requirement.  Without clear scope being defined, it could be left up to each responsile entity to determine what they think meets this criteria. That seems to be problematic since the responsible entities on each end of the communication link may not agree. It will also cause consistency issues with responsible entities that are under different regions. There will be a constant comparison of practices and could result in auditors determining what is necessary.

     

    The SDT should consider refining references to make it clear that IRO-010 and TOP-003 data is limited to only data transmitted between control centers. The data between field assets and the control center is out of scope. Also consider clarifying language that is clear that IRO-010 and TOP-003 informaton that is transferred verbally, including any VoIP, is not included in scope. In lieu of using IRO-010 and TOP-003, the SDT could consider creating a definition of the relevant data. Either of these approaches would be beneficial to facilitate getting necessary understanding, agreements, and/or regional rules implemented. Not having clear criteria will only increase the time needed to implement the standard. Entities will have to negotiate agreement on relevant data and then proceed with implementing protections.

     

    Elizabeth Axson, On Behalf of: Elizabeth Axson, , Segments 2

    - 0 - 0

     

    SMUD does not recommend a prescriptive approach.  It should be a risk based decision based on the entities risk anaysis.

     

    Joe Tarantino, On Behalf of: Sacramento Municipal Utility District - WECC - Segments 1, 3, 4, 5, 6

    - 0 - 0

    Aaron Cavanaugh, On Behalf of: Bonneville Power Administration, WECC, Segments 1, 3, 5, 6

    - 0 - 0

    If it inlcudes system configuration and modeling data that can be modified via inter-entity communication networks, then yes.

    Gerry Adamski, On Behalf of: Gerry Adamski, , Segments 5

    - 0 - 0

    MMWEC supports comments submitted by APPA.

    David Gordon, On Behalf of: David Gordon, , Segments 5

    - 0 - 0

    Many of the systems that are identified in the lists required by TOP-003 R1 and IRO-010 R1 are used for Operational Planning activities only and would not fully define what should fall within the 15 minute adverse impact criteria defined in current NERC CIP Standards which state that only systems that if rendered unavailable, degraded, or misused would, within 15 minutes of its required operation, misoperation, or non-operation, adversely impact one or more Facilities, systems, or equipment, which, if destroyed, degraded, or otherwise rendered unavailable when needed, would affect the reliable operation of the Bulk Electric System.

    Xcel Energy does not believe that IRO-010-2 and TOP-003-3 language adequately defines what ‘sensitive data’ should be included under this new Standard and that a definition of Sensitive Data needs to be created independent of TOP-003-3 requirements or any other Ops & Planning standard.

    Amy Casuscelli, On Behalf of: Xcel Energy, Inc. - MRO, WECC, SPP RE - Segments 1, 3, 5, 6

    - 0 - 0

    The CIP standards are related to protecting BES Cyber Systems and BES Cyber System Information. The Ops and Planning standards are related to other aspects of reliabile operation. Any mixing and matching between CIP and non-CIP standards requirements is an opportunity for confusion, mistakes and potential compliance "double jeopardy".

    Candace Morakinyo, On Behalf of: WEC Energy Group, Inc., MRO, RF, Segments 3, 4, 5

    - 0 - 0

    Deborah VanDeventer, On Behalf of: Edison International - Southern California Edison Company, WECC, Segments 1, 3, 5, 6

    - 0 - 0

    Mike Kraft, On Behalf of: Mike Kraft, , Segments 1, 3, 5, 6

    - 0 - 0

    Yes, Southern Company agrees with the SDT’s approach to utilizing existing Standard requirements that already require the identification of “data and information needed by the RC” to be referenced in the Guidelines and Technical Basis in forming the basis for data transmitted between Control Centers requiring protections in accordance with this Standard.  Given the extensive amount of approved and enforceable Standard requirements, as well as those approved for future enforcement, filed with FERC, or under development that are addressing “data exchange via a secure network”, “all data between Control Centers to use a mutually agreeable security protocol”, and “procedures to address the quality of real-time data”, Southern Company agrees that the specific requirements of IRO-010 and TOP-003 sufficiently address the identification of data needing to be protected when transmitted between Control Centers.  Any additional attempt to define “sensitive BES data” or to add additional requirements to identify “sensitive BES data” is not necessary.   

    Brandon Cain, On Behalf of: Southern Company - Southern Company Services, Inc., SERC, Segments NA - Not Applicable

    - 0 - 0

    See attachment Q1

    Daniel Gacek, On Behalf of: Exelon, , Segments 1, 3, 5, 6

    - 0 - 0

    To promote consistency as the standards change, Reclamation recommends NERC define “sensitive BES data” and “data required for reliable operation” in the NERC Glossary of Terms so that these phrases may be used for all standards (specifically IRO, TOP, and CIP).

    Wendy Center, On Behalf of: U.S. Bureau of Reclamation, , Segments 1, 5

    - 0 - 0

    Mark Riley, On Behalf of: Associated Electric Cooperative, Inc., , Segments 1, 3, 5, 6

    - 0 - 0

    We agree with the basic approach of using TOP-003 and IRO-010 Standards to identify this data but needs to be limited to real time data. We believe TOP-003 and IRO-010 include data that is not “real time” so would be outside this document’s scope. An example of data which is out of scope includes data used for Operational Planning Analyses.

    RSC no Dominion, Segment(s) 1, 0, 2, 4, 5, 6, 7, 3, 3/13/2017

    - 0 - 0

    The SPP Standards Review Group suggests that the drafting team develops a definition for the term “sensitive BES data” something similar to the term “BES Cyber Systems Information” defined for CIP-011. Also, we recommend the definition for the term “sensitive BES data” include language addressing the 15 minute impact operational criteria. 

    SPP’s proposed language for “sensitive BES data”definition:

    Data if rendered unavailable, degraded, or misused within 15 minutes would adversely impact the  Real-Time operation of the Bulk Electric System.

    Our interpretation of the proposed language is that the drafting team has a concern for the protection of the data being transmitted. Since the data being transmitted can’t be broken down and identified as sensitive data or non-sensitive data, the recommendation of developing a definition seems to be the safest path. Additionally, we recommend that the drafting team review the term “reliable operation” in the NERC Glossary of Terms. Also, if the term is used in the Requirement, we recommend using the term’s definition out of the glossary. Our research shows that this is a defined term and we propose that the term should be capitalized. Finally, we would ask with this being a defined term, does this change the drafting team’s intent for the use of this term?

    SPP Standards Review Group, Segment(s) , 3/13/2017

    - 0 - 0

    We do not need a clarifier.

    sean erickson, On Behalf of: Western Area Power Administration, , Segments 1, 6

    - 0 - 0

    Charles Yeung, On Behalf of: Southwest Power Pool, Inc. (RTO), , Segments 2

    - 0 - 0

    Tacoma supports the comments of Utility Services, Inc

    Marc Donaldson, On Behalf of: Tacoma Public Utilities (Tacoma, WA), , Segments 1, 3, 4, 5, 6

    - 0 - 0

    Hot Answers

    Douglas Webb, On Behalf of: Great Plains Energy - Kansas City Power and Light Co., SPP RE, Segments 1, 3, 5, 6

    - 0 - 0

    Vivian Moser, On Behalf of: Vivian Moser, , Segments 1, 3, 5, 6

    - 0 - 0

    Other Answers

    Richard Kinas, On Behalf of: Richard Kinas, , Segments 3, 5

    - 0 - 0

    Entergy/NERC Compliance, Segment(s) 1, 5, 3/1/2017

    - 0 - 0

    Aaron Ghodooshim, On Behalf of: FirstEnergy - FirstEnergy Corporation, , Segments 1, 3, 4

    - 0 - 0

    DTE Energy - DTE Electric, Segment(s) 5, 4, 3, 2/27/2017

    - 0 - 0

    Glen Farmer, On Behalf of: Avista - Avista Corporation, , Segments 1, 3, 5

    - 0 - 0

    MRO NSRF, Segment(s) 3, 4, 5, 6, 1, 2, 1/4/2017

    - 0 - 0

    SRP has been generally supportive of the direction the SDT has gone for both TOP-001-4 and IRO-002-5 standard development under project 2016-01.

    Lona Calderon, On Behalf of: Salt River Project, WECC, Segments 1, 3, 5, 6

    - 0 - 0

    Mike Smith, On Behalf of: Manitoba Hydro , , Segments 1, 3, 5, 6

    - 0 - 0

    Tennessee Valley Authority, Segment(s) 1, 3, 5, 6, 9/1/2016

    - 0 - 0

    Supporting APPA comments

    Seattle City Light Ballot Body, Segment(s) 1, 4, 6, 5, 3, 12/2/2016

    - 0 - 0

    Andrew Gallo, On Behalf of: Andrew Gallo, , Segments 1, 3, 4, 5, 6

    - 0 - 0

    Availability is already defined in the data specifications of each RC and TOP.

    Con Edison, Segment(s) 1, 3, 5, 6, 0, 6/24/2016

    - 0 - 0

    Duke Energy agrees that the “availability” of this data is being addressed in Project 2016-01 Modifications to TOP and IRO Standards. We would like to mention to the drafting team that the definition of “Control Center” may need to be re-visited as a result of these new protections. Currently, the definition of “Control Center” may include generation control rooms. We do not believe that these additional protections being proposed by the draft language should be applicable to generation control rooms.

    Duke Energy , Segment(s) 1, 5, 6, 4/10/2014

    - 0 - 0

    Preston Walker, On Behalf of: PJM Interconnection, L.L.C., SERC, RF, Segments 2

    - 0 - 0

    CenterPoint Energy does not believe that TOP-001-4 and IRO-002-5 adequately address availability of inter-entity and intra-entity Control Center communication of data.  Both Standards speak to data exchange capability having redundant and diversely routed data exchange infrastructure (hardware) once external data enters the primary Control Center.  TOP-001-4 and IRO-002-5 do not ensure availability or communication of data between inter-entity and intra-entity Control Centers, but only the redundancy of infrastructure internal to the requesting entity’s primary Control Center.  Rationale language is specific to this, “Infrastructure that is not within the TOP’s primary Control Center is not addressed by the proposed requirement.”  CenterPoint Energy believes data exchange capability used in TOP-001-4  does not fully address ‘data links’ between inter-entity and intra-entity Control Centers. 

    CenterPoint Energy recommends the drafting team re-evaluate “availability” and how it can be adequately addressed by other existing standards.

    Lan Nguyen, On Behalf of: CenterPoint Energy Houston Electric, LLC, Texas RE, Segments 1

    - 0 - 0

    Jeff Johnson, On Behalf of: Sempra - San Diego Gas and Electric, WECC, Segments 1, 2, 3, 4, 5, 6, 7, 8

    - 0 - 0

    Lauren Price, On Behalf of: Lauren Price, , Segments 1

    - 0 - 0

    Kara White, On Behalf of: NRG - NRG Energy, Inc., FRCC, MRO, WECC, Texas RE, NPCC, SERC, SPP RE, RF, Segments 3, 4, 5, 6

    - 0 - 0

    Laura Nelson, On Behalf of: Laura Nelson, , Segments 1

    - 0 - 0

    Availability is adequately covered by other standards.

    Brian Evans-Mongeon, On Behalf of: Utility Services, Inc., , Segments 4

    - 1 - 0

    Jason Snodgrass, On Behalf of: Jason Snodgrass, , Segments 1

    - 0 - 0

    Texas RE does not have comments in response to this question.

    Rachel Coyne, On Behalf of: Texas Reliability Entity, Inc., , Segments 10

    - 0 - 0

    Guy Andrews, On Behalf of: Guy Andrews, , Segments 3, 4

    - 0 - 0

    Jamie Monette, On Behalf of: Allete - Minnesota Power, Inc., , Segments 1

    - 0 - 0

    Aaron Austin, On Behalf of: Aaron Austin, , Segments 3, 5

    - 0 - 0

    Anton Vu, On Behalf of: Los Angeles Department of Water and Power, , Segments 1, 3, 5, 6

    - 0 - 0

    PSEG REs, Segment(s) 5, 6, 3, 1, 3/6/2017

    - 3 - 0

    HQT agree, but the reference should be clearly stated. Since IRO-010-2 and TOP-003-3 are future enforceable reliability Standards, the SDT should evaluate the risk of those not being endorsed. If this should happen, the basis would be absent of CIP-012. Also, with the present suggestion, CIP standard would be used to define controls of IRO and TOP standards. This situation could cause an audit gap: the CIP auditors would not have requirement from IRO or TOP to audit against and IRO and TOP auditors would not security requirement to audit against.

    Si Truc Phan, On Behalf of: Hydro-Qu?bec TransEnergie, NPCC, Segments 1

    - 0 - 0

    ERCOT agrees with the SDT’s assertion that “availability” is currently addressed by other reliability standards. While TOP-001-4 and IRO-002-5 do address availability, the SDT could cite more of the standards that provide this compliance and enforcement coverage. 

    Elizabeth Axson, On Behalf of: Elizabeth Axson, , Segments 2

    - 0 - 0

    Joe Tarantino, On Behalf of: Sacramento Municipal Utility District - WECC - Segments 1, 3, 4, 5, 6

    - 0 - 0

    BPA does not agree that “availability” is adequately addressed by redundant and diversely routed data exchange capabilities at the primary Control Center for the following reasons:

    1. Currently, the proposed language on page 2 includes protection of “confidentiality and integrity  of data required for reliable operation of the BES” and eliminates “availability” from the language of the requirement.   However, in the Confidentiality/Integrity/Availability (CIA) triad for information security, each leg must be balanced against the other two legs.  By segregating Availability to TOP-001-4 and IRO-002-5, while leaving Confidentiality/Integrity in the proposed CIP-012 standard, it becomes impossible to properly balance all three legs of the triad to achieve optimum Reliability of the BES.  The cyber security triad represents design tradeoffs; entities can’t properly design communications networks – or worse: existing infrastructure may need to be rebuilt – if one of the options (Availability) is removed from consideration.

    2. While the requirements of TOP-001-4 and IRO-002-5 (redundancy and diverse routing of data) can be used to achieve increased Availability, it can also be achieved through other equally effective methods.  Therefore, “availability” is not adequately addressed by TOP-001-4 and IRO-002-5 and limits entities’ options to address availability by other methods more appropriate to their systems. 

      Therefore, BPA proposes that “availability” be added into the proposed language on page 2  to meet the security objectives of Order 822, i.e., “…to protect AVAILBILITY, confidentiality and integrity of data required for reliable operation....”

      BPA also encourages the SDT to use the Guidelines and Technical Basis section to recognize the distinction between the engineering/design term “availability” (in which availability is quantitative  – e.g., a system is designed to be available 99.99% of the time) and the cyber security application in which availability is a qualitative element of security that is constantly balanced against two other (often competing) elements (confidentiality and integrity).

    Aaron Cavanaugh, On Behalf of: Bonneville Power Administration, WECC, Segments 1, 3, 5, 6

    - 0 - 0

    Gerry Adamski, On Behalf of: Gerry Adamski, , Segments 5

    - 0 - 0

    David Gordon, On Behalf of: David Gordon, , Segments 5

    - 0 - 0

    Amy Casuscelli, On Behalf of: Xcel Energy, Inc. - MRO, WECC, SPP RE - Segments 1, 3, 5, 6

    - 0 - 0

    Redundancy and diversity are the primary tools available to support "availability".

    Candace Morakinyo, On Behalf of: WEC Energy Group, Inc., MRO, RF, Segments 3, 4, 5

    - 0 - 0

    Deborah VanDeventer, On Behalf of: Edison International - Southern California Edison Company, WECC, Segments 1, 3, 5, 6

    - 0 - 0

    Mike Kraft, On Behalf of: Mike Kraft, , Segments 1, 3, 5, 6

    - 0 - 0

    Yes, Southern Company agrees with the SDT that “availability” is adequately addressed by the other Standards referenced and by common industry practices.  Southern Company also offers to the SDT that the only aspect of cyber security at issue under this directive is data integrity. Not only is it appropriate for this effort to be silent regarding availability, we would request that the SDT consider that this Standard should also remain silent regarding “confidentiality.” Including confidentiality will likely result in unintended consequences with no commensurate reduction in risk to BES reliability.

    Brandon Cain, On Behalf of: Southern Company - Southern Company Services, Inc., SERC, Segments NA - Not Applicable

    - 0 - 0

    See attachment Q1

    Daniel Gacek, On Behalf of: Exelon, , Segments 1, 3, 5, 6

    - 0 - 0

    To promote consistency as the standards change, Reclamation recommends NERC define “availability” in the NERC Glossary of Terms so that the term may be used for all standards (specifically IRO, TOP, and CIP standards).

    Wendy Center, On Behalf of: U.S. Bureau of Reclamation, , Segments 1, 5

    - 0 - 0

    Mark Riley, On Behalf of: Associated Electric Cooperative, Inc., , Segments 1, 3, 5, 6

    - 0 - 0

    Availability is adequately covered by other standards.

    RSC no Dominion, Segment(s) 1, 0, 2, 4, 5, 6, 7, 3, 3/13/2017

    - 0 - 0

    SPP Standards Review Group, Segment(s) , 3/13/2017

    - 0 - 0

    sean erickson, On Behalf of: Western Area Power Administration, , Segments 1, 6

    - 0 - 0

    Charles Yeung, On Behalf of: Southwest Power Pool, Inc. (RTO), , Segments 2

    - 0 - 0

    Tacoma supports the comments of Utility Services, Inc

    Marc Donaldson, On Behalf of: Tacoma Public Utilities (Tacoma, WA), , Segments 1, 3, 4, 5, 6

    - 0 - 0

    Hot Answers

    Douglas Webb, On Behalf of: Great Plains Energy - Kansas City Power and Light Co., SPP RE, Segments 1, 3, 5, 6

    - 0 - 0

    AZPS can see the value in the development of an entirely new standard; however, AZPS is concerned that the development of an entirely new standard is beyond the scope of the FERC directive, which states that “modifications to CIP-006-6 to provide controls to protect, at a minimum, communication links and data communicated between bulk electric system Control Centers are necessary in light of the critical role Control Center communications play in maintaining bulk electric system reliability.” Therefore, AZPS requests that the SDT evaluate and clarify whether the SAR provides the additional authority necessary for the development of a new standard, as opposed to the modification of CIP-006-6. 

     

    Vivian Moser, On Behalf of: Vivian Moser, , Segments 1, 3, 5, 6

    - 0 - 0

    Other Answers

    Richard Kinas, On Behalf of: Richard Kinas, , Segments 3, 5

    - 0 - 0

    Entergy/NERC Compliance, Segment(s) 1, 5, 3/1/2017

    - 0 - 0

    Aaron Ghodooshim, On Behalf of: FirstEnergy - FirstEnergy Corporation, , Segments 1, 3, 4

    - 0 - 0

    The existing cyber security controls in CIP-003 and CIP-005 already provide the basis for the protection of the communication links between control centers. It is better to enhance these requriements to include the communication links then a new requirement

    DTE Energy - DTE Electric, Segment(s) 5, 4, 3, 2/27/2017

    - 0 - 0

    Glen Farmer, On Behalf of: Avista - Avista Corporation, , Segments 1, 3, 5

    - 0 - 0

    If the objective is to provide protection of the telecommunications interface or boundaries at control centers, it appears this is already addressed under CIP-002 and CIP-006.  Clarifying language for existing standards would be sufficient to address protection issues. 

    MRO NSRF, Segment(s) 3, 4, 5, 6, 1, 2, 1/4/2017

    - 0 - 0

    SRP disagrees with the proposition to develop a new CIP standard.  SRP suggests keeping requirements for low impact systems in CIP-003. Since CIP-005 already protects the BCS up to the point of EAP, it is possible to add another requirement to protect “BES sensitive data” between EAPs via site to site encryption, application layer encryption, or physical protections (as described in the “Draft Guidance” section). In addition to CIP-003 and CIP-005, the SDT should consider modifying CIP-006 R1.10, which includes requirements to protect cabling and other nonprogrammable communication components, to ensure no conflicts.

    SRP prefers a risk-based approach that has different requirements for high, medium, and low impact systems.

    Lona Calderon, On Behalf of: Salt River Project, WECC, Segments 1, 3, 5, 6

    - 0 - 0

    Mike Smith, On Behalf of: Manitoba Hydro , , Segments 1, 3, 5, 6

    - 0 - 0

    Any focus on protection of communications networks is misplaced. Protection of data, regardless of the communications medium or network, needs to be the focus of any standards development activities.

    Distributed generation, proliferation of smart metering, and ever increasing capabilities in speed and bandwidth of communications technologies are creating new sources of data that can be beneficial in real-time power operations. Entities require innovative mechanisms to securely acquire real-time information into SCADA systems to enable better decision making, whether the data comes via cellular, satellite, leased line, or private carrier connections.

    NERC should benchmark with other regulatory bodies which oversee industries with similar needs, such as the financial sector. The financial industry originally used carbon-paper copies of credit cards, submitted to centralized clearing houses, to process credit transactions. Visa provided the first electronic, real-time transaction clearing terminal in 1979. The technologically has proliferated to the point that any smart phone can be used to execute financial transactions in real time. The physical and cyber security of the end points themselves may not be under control of financial institutions. Essentially, what the financial sector has done is provide interfaces to a very sensitive network to millions of devices in real time.

    There are many parallels to the power sector, wherein a large quantity of devices increasingly need to send data to control systems over a variety of communications technologies securely, in real-time.

    Financial companies have an inherent financial interest in maximizing availability and accessibility of the financial network to increase transactions. Power systems have an inherent reliability interest in getting more information to enable operators to make better real-time decisions.

    NERC is in a unique position wherein it may leverage lessons learned from others industries who have decades of experience addressing these types of issues. Any standards development would greatly benefit from cross-pollinization of expertise and not be overly prescriptive so as to limit emerging technologies such a quantum or crypto block chain techniques.

    Tennessee Valley Authority, Segment(s) 1, 3, 5, 6, 9/1/2016

    - 0 - 0

    Supporting APPA comments

    Seattle City Light Ballot Body, Segment(s) 1, 4, 6, 5, 3, 12/2/2016

    - 0 - 0

    A new standard will assist in defining the requirements addressing the inter-relationship between entities of differing impact levels.

    Andrew Gallo, On Behalf of: Andrew Gallo, , Segments 1, 3, 4, 5, 6

    - 0 - 0

    We believe that protection of communications networks would best be incorporated into existing CIP-005 or CIP-011 Standards.

    Con Edison, Segment(s) 1, 3, 5, 6, 0, 6/24/2016

    - 0 - 0

    Duke Energy disagrees with the drafting of a new standard to address this directive. We feel that based on the current draft language, this requirement would be better suited in CIP-003-3. Adding to an already existing framework rather than creating a new standard is preferable. Creating a new standard would also require an entity to create additional documentation, rather than adding to already existing documentation.

    Duke Energy , Segment(s) 1, 5, 6, 4/10/2014

    - 0 - 0

    PJM would prefer to put the language in CIP-005 for Highs and Mediums and CIP-003 for Lows.

    Preston Walker, On Behalf of: PJM Interconnection, L.L.C., SERC, RF, Segments 2

    - 0 - 0

    Lan Nguyen, On Behalf of: CenterPoint Energy Houston Electric, LLC, Texas RE, Segments 1

    - 0 - 0

    Jeff Johnson, On Behalf of: Sempra - San Diego Gas and Electric, WECC, Segments 1, 2, 3, 4, 5, 6, 7, 8

    - 0 - 0

    Lauren Price, On Behalf of: Lauren Price, , Segments 1

    - 0 - 0

    NRG recommends maintaining the current Standards (CIP-003, CIP-005, CIP-006, CIP-007, and CIP-011) and revise them accordingly or as needed to protect the data. These particular Standards have the potential to address the concerns pertaining to sensitive BES data, regardless of the entity’s size or impact level. Also, they can reduce the potential of creating redundancy issues.

    Kara White, On Behalf of: NRG - NRG Energy, Inc., FRCC, MRO, WECC, Texas RE, NPCC, SERC, SPP RE, RF, Segments 3, 4, 5, 6

    - 0 - 0

    In isolation, it might be less confusing to group the new requirements together; however, the continued addition of new standards, attachments, etc. has made the standards increasingly difficult for Responsible Entities to fully understand and comply with. If these new requirements are necessary, IPC suggests adding them to CIP-005-5 as R3 with associated parts since CIP-005-5 deals with ESP boundaries and external connections.

    Laura Nelson, On Behalf of: Laura Nelson, , Segments 1

    - 0 - 0

    There are concerns about the applicability section and how it will interact with the existing CIP Standards exemption 4.2.3.2.  The applicability section should limit the scope to only real time communication networks or data between Control Centers. 

    Would like additional guidance on the applicability of technologies like voice communication email, text messaging …

     

    Consider including language for CIP Exceptional Circumstances

    Brian Evans-Mongeon, On Behalf of: Utility Services, Inc., , Segments 4

    - 1 - 0

    If the SDT develops a new CIP standard it could be difficult for an entity to know which standard to apply if there is any overlap between existing standards and thus the preference would be to incorporate any new requirements into CIP-003 and CIP-005.

    Jason Snodgrass, On Behalf of: Jason Snodgrass, , Segments 1

    - 0 - 0

    The Standard Drafting Team’s proposed approach seems consistent with the discussion in FERC Order No. 822 delineating between the CIP Standards focusing on “boundary” issues – that is, the definition of boundaries and the creation of protections at those boundaries – and the data security and communication link issue for BES sensitive data being transmitted across such boundaries. 

    Rachel Coyne, On Behalf of: Texas Reliability Entity, Inc., , Segments 10

    - 0 - 0

    If the SDT develops a new CIP standard it could be difficult for an entity to know which standard to apply if there is any overlap between existing standards and thus the preference would be to incorporate any new requirements into CIP-003 and CIP-005.

    Guy Andrews, On Behalf of: Guy Andrews, , Segments 3, 4

    - 0 - 0

    Jamie Monette, On Behalf of: Allete - Minnesota Power, Inc., , Segments 1

    - 0 - 0

    Requirements for communications to high and medium impact BCS should reside in the location with the other electronic access requirements in CIP-005.  Similarly, the requirements for communications between low impact BCS at control centers should reside with the other requirements for low impact BCS written comenserate with the risk.  There should be a “high water mark” provision to protect communications from low impact BCS at control centers to high and/or medium impact BCS at control centers.

    Aaron Austin, On Behalf of: Aaron Austin, , Segments 3, 5

    - 0 - 0

    Anton Vu, On Behalf of: Los Angeles Department of Water and Power, , Segments 1, 3, 5, 6

    - 0 - 0

    A new standard would be less disruptive. This way all policy/procedure changes would be contained in 1 document.

    PSEG REs, Segment(s) 5, 6, 3, 1, 3/6/2017

    - 3 - 0

    CIP-005 is used to define the network compliance controls. Spreading network compliance controls throughout different CIP could result in confusion in the application of the different required controls. The CIA requirements for data (in transit or at rest) should be explicitly defined in CIP-005.

    Si Truc Phan, On Behalf of: Hydro-Qu?bec TransEnergie, NPCC, Segments 1

    - 0 - 0

    Since these requirements are not limited to just communications between entities at the same impact level, a new standard will assist in defining the requirements that address the interrelationship between entities of differing impact levels. 

    Elizabeth Axson, On Behalf of: Elizabeth Axson, , Segments 2

    - 0 - 0

    No – utilize existing standards.  The impact level should be considered within the the context of existing standards.

    Joe Tarantino, On Behalf of: Sacramento Municipal Utility District - WECC - Segments 1, 3, 4, 5, 6

    - 0 - 0

    BPA does not agree that a new standard is required.  A new standard could result in isolated requirements that do not blend with – or even contradict – existing requirements.  The objectives can be met by coordinating with existing standards such as CIP-003 & CIP-005.

    BPA also proposes that the Guidelines and Technical Basis section should emphasize that entities can/should leverage evidence from the numerous other CIP standards where data quality, confidentiality and availability is also addressed.

     

    Potential language to be incorporated into CIP-005-x R3:

    Applicable Systems: High Impact BES Cyber Systems at Control Centers; Medium Impact BES Cyber Systems at Control Centers

    Requirements: R3.  The Responsible Entity shall implement one or more documented plan(s) that achieve the security objective to protect availability, confidentiality and integrity of data required for reliable operation of the BES. The plan applies to data being transferred across communication networks between Control Centers, both inter-entity and intra-entity and shall include each of the applicable requirement parts in CIP-005-x Table R3.

    3.1 Identify data required for reliable operation of the BES (if not already identified under IRO-010-2 and TOP-003-3).

    3.2 Where technically feasible, have one or more methods for protecting availability, confidentiality and integrity of the data identified in 3.1.

    3.3 Have one or more methods for alarming to a central location when loss of protection of data failed to a central location with a method of immediate response.

    3.4 Have one or more methods for timely response to alarms identified in 3.3.

    Potential language to be incorporated into the next version of CIP-003-x, R1.2, For its assets identified in CIP-002 containing low impact BES Cyber Systems, if any:

    New:

    1.2.7. Ensuring the availability, confidentiality and integrity of data required for reliable operation of the BES between Control Centers, both inter-entity and intra-entity.

    Aaron Cavanaugh, On Behalf of: Bonneville Power Administration, WECC, Segments 1, 3, 5, 6

    - 0 - 0

    A new standard would be preferred to specify the communication network requirements.

    Gerry Adamski, On Behalf of: Gerry Adamski, , Segments 5

    - 0 - 0

    MMWEC supports comments submitted by APPA.

    David Gordon, On Behalf of: David Gordon, , Segments 5

    - 0 - 0

    Xcel Energy believes a new Standard is not required to address the risks identified in FERC Order 822.  Xcel Energy believes that existing CIP-003 and CIP-005 standards should be updated as determined necessary to address the concerns identified in the order.  Current CIP Standards include a comprehensive set of requirements to protect the Bulk Electric System and specific controls to address new risks should be integrated into existing requirements when possible.  Creating a new standard would add unnecessary complexity and lead to confusion when it may include requirements already covered by CIP-003, CIP-005, CIP-006 and potentially CIP-011.  The development of a new Standard to address this concern without coordination of existing CIP requirements would also create an unknown and complex audit approach with risk of creating instances of double jeaproady that could otherwise be prevented with proper integration and revisions of current CIP Standards to address the concern.

    Amy Casuscelli, On Behalf of: Xcel Energy, Inc. - MRO, WECC, SPP RE - Segments 1, 3, 5, 6

    - 0 - 0

    It may be impossible to protect the "networks". It is more important to ensure the availability, confidentiality and integrity of the data flowing over those networks. As previously noted, redundancy and diversity, along with monitoring, are tools which can ensure availability, and can be addressed in the ops & planing standards. Properly implemented encryption, is a tool which can ensure confidentiality and integrity of the data and can be addressed within CIP-005. 

    Candace Morakinyo, On Behalf of: WEC Energy Group, Inc., MRO, RF, Segments 3, 4, 5

    - 0 - 0

    Because of the way SCE has organized the assignment of CIP requirements into Programs, this has no impact to us operationally.   SCE believes the general benefit of creating a new CIP standard (CIP-012) is that like requirements would be grouped together and easier to locate.

    Deborah VanDeventer, On Behalf of: Edison International - Southern California Edison Company, WECC, Segments 1, 3, 5, 6

    - 0 - 0

    Basin Electric would prefer low impact requirements be kept in CIP-003 as this minimizes potential confusion with low impact level only entities.  Basin Electric would prefer additions to CIP-005 vs. a new standard as the protections for high and medium impact levels would be closely tied to an Electronic Security Perimeter and crossing the applicable boundary for a Control Center.

    Mike Kraft, On Behalf of: Mike Kraft, , Segments 1, 3, 5, 6

    - 0 - 0

    Southern Company disagrees with this approach and respectfully requests the SDT to consider the technical and procedural controls that result from these new requirements will almost certainly be designed, implemented, and maintained in conjunction with the controls in CIP-005 (for Highs and Mediums) and CIP-003 (for Lows).  Rather than create a new set of requirements, guidance, RSAWs, etc. for something that will have to be audited along with and as if it were a part of CIP-005 (for Highs and Mediums) or part of CIP-003 (for Lows), we would recommend modifying those Standards.

    Brandon Cain, On Behalf of: Southern Company - Southern Company Services, Inc., SERC, Segments NA - Not Applicable

    - 0 - 0

    See attachment Q1

    Daniel Gacek, On Behalf of: Exelon, , Segments 1, 3, 5, 6

    - 0 - 0

    Reclamation recommends the requirements for protecting communication networks should be included in CIP-003-7i for low impact BES Cyber Systems; and CIP-005-5 for the high and medium BES Cyber Systems.

    Wendy Center, On Behalf of: U.S. Bureau of Reclamation, , Segments 1, 5

    - 0 - 0

    The requirements span multiple impact levels and a new standard would assist entities in identifying the applicability of the new requirements.

    Mark Riley, On Behalf of: Associated Electric Cooperative, Inc., , Segments 1, 3, 5, 6

    - 0 - 0

    Request the SDT consider and address how existing CIP Standards exemption 4.2.3.2 could be impacted.

    There are concerns about the applicability section and how it will interact with the existing CIP Standards exemption 4.2.3.2.  The applicability section should limit the scope to only real time communication networks or data between Control Centers. 

    Would like additional guidance on the applicability of technologies like voice communication email, text messaging.

    Consider including language for CIP Exceptional Circumstances.

    RSC no Dominion, Segment(s) 1, 0, 2, 4, 5, 6, 7, 3, 3/13/2017

    - 0 - 0

    We recommend maintaining the current Standards (CIP-003, CIP-005) and revising them accordingly or as needed. These particular Standards have the potential to address the concerns pertaining to sensitive BES data regardless of the entity’s size or impact level. Also, they can reduce the potential of creating redundancy issues.

    SPP Standards Review Group, Segment(s) , 3/13/2017

    - 0 - 0

    Per the NSRF:  If the objective is to provide protection of the telecommunications interface or boundaries at control centers, it appears this is already addressed under CIP-002 and CIP-006. Clarifying language for existing standards would be sufficient to address protection issues.  

     

    sean erickson, On Behalf of: Western Area Power Administration, , Segments 1, 6

    - 0 - 0

    If the objective is to provide protection of the telecommunications interface or boundaries at control centers, it appears this is already addressed under CIP-002 and CIP-006.  At most this would require some clarifying language. 

    Charles Yeung, On Behalf of: Southwest Power Pool, Inc. (RTO), , Segments 2

    - 0 - 0

    Tacoma supports the comments of Utility Services, Inc

    Marc Donaldson, On Behalf of: Tacoma Public Utilities (Tacoma, WA), , Segments 1, 3, 4, 5, 6

    - 0 - 0

    Hot Answers

    We support a path forward of focusing on protection of communication links with language to limit the scope of data to be protected with that data that does not have a shelf life or is considered perishable.

    Douglas Webb, On Behalf of: Great Plains Energy - Kansas City Power and Light Co., SPP RE, Segments 1, 3, 5, 6

    - 0 - 0

    AZPS does not agree that protection of the communication links alone achieves the FERC directive, which also references controls to protect the data communicated between BES Control Centers. Controls that would be applicable to the protection of data include controls such as encryption, which is different and superior to the controls that would be used to protect communication links alone. 

    Vivian Moser, On Behalf of: Vivian Moser, , Segments 1, 3, 5, 6

    - 0 - 0

    Other Answers

    Richard Kinas, On Behalf of: Richard Kinas, , Segments 3, 5

    - 0 - 0

    Perhaps the language should be edited in a manner that will allow entities to protect links and/or the sensitive BES data itself, allowing entities flexability in achieving the security objective.

    Entergy/NERC Compliance, Segment(s) 1, 5, 3/1/2017

    - 0 - 0

    Aaron Ghodooshim, On Behalf of: FirstEnergy - FirstEnergy Corporation, , Segments 1, 3, 4

    - 0 - 0

    DTE Energy - DTE Electric, Segment(s) 5, 4, 3, 2/27/2017

    - 0 - 0

    Glen Farmer, On Behalf of: Avista - Avista Corporation, , Segments 1, 3, 5

    - 0 - 0

    The NSRF recommends focusing on the boundaries or interface points, not the links between control centers. 

    MRO NSRF, Segment(s) 3, 4, 5, 6, 1, 2, 1/4/2017

    - 0 - 0

    SRP does not agree with the SDT’s approach to focus the draft language on the protection of communication links. The focus of the draft language should be on both the communication links and the sensitive BES data, as required by FERC Order No. 822.  The reliability of the communication links and integrity of sensitive BES data are critical to the reliability of the BES.

    SRP proposes merging the language that focuses on protection of communication with the language in the “Draft Guidance” section pertaining to the data-centric approach.

    Lona Calderon, On Behalf of: Salt River Project, WECC, Segments 1, 3, 5, 6

    - 0 - 0

    Mike Smith, On Behalf of: Manitoba Hydro , , Segments 1, 3, 5, 6

    - 0 - 0

    TVA notes that within a cloud-based communications network such as the Internet, an MPLS network, a meshed network, or other non-point-to-point type of communications topology, it would be difficult to quantify a “link” as a physical or logical construct, as the “link” may be constructed of a virtual circuitry that traverses any number of underlying physical components.  The language should be revised to focus on protecting information instead of antiquated notions of physical communication components associated with “links.”

    TVA is also concerned that the proposed language is vague enough to encompass transport links carrying an e-mail sent between two Control Centers, as no qualifications are provided regarding timeliness of the information.  Should Internet based transport relay the e-mail, the registered entity would be obligated to protect, end-to-end, the Internet “data-links” connecting the two Control Centers.

    TVA suggests focusing on the “sensitive bulk electric system data” moving between Control Centers and not underlying communications infrastructure.

    Tennessee Valley Authority, Segment(s) 1, 3, 5, 6, 9/1/2016

    - 0 - 0

    Supporting APPA comments

    Seattle City Light Ballot Body, Segment(s) 1, 4, 6, 5, 3, 12/2/2016

    - 0 - 0

    This requirement should be drafted to allow Responsible Entities to implement an approach which fits the needs of its processes and infrastructure; allowing for either data and/or communication link protection.

    Andrew Gallo, On Behalf of: Andrew Gallo, , Segments 1, 3, 4, 5, 6

    - 0 - 0

    1. Recommend that the SDT focus on protecting the data for reliability and availability.

    2. We recommend that this Standard not prescribe the method for protecting the data but the objective of reliability and availability as the focus. Alternative approaches of application security or communication security controls should be allowed and clearly addressed in the Requirements.  The proposed procedures in Draft Language 1.1 and 1.2 would not be required.

    3. FERC Order 822 section 58 clarifies this scope as inter-Control Center and intra-Control Center communications. The guidance seems to extend the scope beyond this

    4. Recommend reviewing NIST Special Publication 800-47 which is titled Security Guideline for Interconnecting Information Technology Systems with a focus toward reliability and availability

    5. The Standard should be an outcome-based Standard.

    Con Edison, Segment(s) 1, 3, 5, 6, 0, 6/24/2016

    - 0 - 0

    Duke Energy agrees with the approach that the focus of the protection should be on the communication links rather than the sensitive BES data itself.

    Duke Energy , Segment(s) 1, 5, 6, 4/10/2014

    - 0 - 0

    Preston Walker, On Behalf of: PJM Interconnection, L.L.C., SERC, RF, Segments 2

    - 0 - 0

    CenterPoint Energy agrees that the focus should be on the protection of the communication link used to transport sensitive BES data and not the sensitive BES data itself.  This aligns with the language in the FERC order “to require responsible entities to implement controls to protect, at a minimum, all communication links and sensitive bulk electric system data communicated between all bulk electric system Control Centers.”(FERC Order 822, P.41)

    Lan Nguyen, On Behalf of: CenterPoint Energy Houston Electric, LLC, Texas RE, Segments 1

    - 0 - 0

    As written, it is unclear what constitutes a “communication link”, especially if that link is provided by a 3rd party.  The standard should address the protection of the data.

    Jeff Johnson, On Behalf of: Sempra - San Diego Gas and Electric, WECC, Segments 1, 2, 3, 4, 5, 6, 7, 8

    - 0 - 0

    Lauren Price, On Behalf of: Lauren Price, , Segments 1

    - 0 - 0

    NRG likes the approach of protecting communication links because you can identify the data, but at what point does the data transfer ownership from the responsible entity to the RC or BA (therefore, NRG also recommends that the SDT also definine the data to be protected).  From that standpoint, additional requirement protections to be added into CIP-005 are recommended (by NRG) to protect the confidentiality and integrity of the data. NRG  recommends working on a multiple approach to address the directive. The primary solution could address the protection of the communication link. As an alternative method, NRG recommends that the drafting team consider other methods that are not link level controls. Additionally, NRG asks that the drafting team provide clarity on the difference between “communication links” and “communication networks”.

    Kara White, On Behalf of: NRG - NRG Energy, Inc., FRCC, MRO, WECC, Texas RE, NPCC, SERC, SPP RE, RF, Segments 3, 4, 5, 6

    - 0 - 0

    Either approach of protecting the data or the communication links should be an option for a Responsible Entity as long as the Responsible Entity meets the security objective of providing confidential data that has integrity.

    Laura Nelson, On Behalf of: Laura Nelson, , Segments 1

    - 0 - 0

    We like the option to protect either the data or the links.  We would like to see these options clearly defined within the requirements and not just in the guidance.  The Standard should be an outcome based Standard.

    FERC Order 822 section 58 clarifies this scope as inter-Control Center and intra-Control Center communications. The guidance seems to extend the scope beyond this by including references to DP’s and listing Data links without reference to Control Centers. 

    Brian Evans-Mongeon, On Behalf of: Utility Services, Inc., , Segments 4

    - 1 - 0

    Either of the two approaches could provide good security measure but why limit the entity to only one approach. It would be better to allow each entity to choose their own approach which best fits their environment.

    Jason Snodgrass, On Behalf of: Jason Snodgrass, , Segments 1

    - 0 - 0

    Texas RE suggests that the suggested requirements could be more clear.  FERC Order No. 822, P. 56 provides that “NERC’s response to the directives in this Final Rule should identify the scope of sensitive bulk electric system data that must be protected and specify how the confidentiality, integrity, and availability of each type of bulk electric system data should be protected while it is being transmitted or at rest.”  Elsewhere, FERC Order No. 822 specifically refuted reliance on the EOP-008-1 Standard because that Standard “does not provide for the protection of communication links and sensitive bulk electric system data communicated between bulk electric systems Control Centers.”  FERC Order No. 822, P. 63.  In short, FERC Order No. 822 appears to specifically contemplate protections for both communications links and electric system data as separate categories.

     

    On page 4 of the Unofficial Comment Form, the Standard Drafting Team (SDT) notes that “the Responsible Entity must document and implement plans for the protection of the confidentiality and integrity of operational reliability data communicated between Control Centers.”  The SDT then references examples of methods to protect data, such as site to site encryption and application layer encryption.  Texas RE believes these are appropriate examples of methods to protect electric system data that is consistent with the intent of FERC Order No. 822.

     

    However, Texas RE is concerned that the SDT’s proposal potentially subsumes these data-focused protection methods under protections for physical communications links themselves.  Although such protections are appropriate, FERC Order No. 822 appears to view data security and physical communications link protections as separate, augmentative elements of a robust data security program.  As such, Texas RE recommends that the SDT further specify that in order to achieve the security objective to protect confidentiality and integrity of data required for the reliable operation of the BES, responsible entities include the following language:

     

    1.4 Method(s) for protecting the operational reliability of data communicated between Control Centers identified in 1.1, where technically feasible.

    Rachel Coyne, On Behalf of: Texas Reliability Entity, Inc., , Segments 10

    - 0 - 0

    Either of the two approaches could provide good security measure but why limit the entity to only one approach. It would be better to allow each entity to choose their own approach which best fits their environment.

    Guy Andrews, On Behalf of: Guy Andrews, , Segments 3, 4

    - 0 - 0

    Jamie Monette, On Behalf of: Allete - Minnesota Power, Inc., , Segments 1

    - 0 - 0

    AEP believes the security directive for the requirements should be written in a way to permit any responsible entity to achieve the directive, regardless of technology or preferred architecture.  

    Aaron Austin, On Behalf of: Aaron Austin, , Segments 3, 5

    - 0 - 0

    Anton Vu, On Behalf of: Los Angeles Department of Water and Power, , Segments 1, 3, 5, 6

    - 0 - 0

    We agree with the approach to focus the draft language on the protection of  the communication links. If the SDT decides to focus on the sensitive BES data, then a definition for “sensitive BES data” would need to be developed. The applicable requirements in IRO-10-2 and TOP-003-3 do not adequately address this.

    PSEG REs, Segment(s) 5, 6, 3, 1, 3/6/2017

    - 3 - 0

    The strategy of protecting the sensitive BES data itself is a better one than to focus on wether the data is at rest or in-transit. The CIA objectives could be added to CIP-005 & CIP-011. This would maintain the current consistency and approach of the CIP standard.

    Si Truc Phan, On Behalf of: Hydro-Qu?bec TransEnergie, NPCC, Segments 1

    - 0 - 0

    ERCOT does not agree with protection of communication links. The requirement should be written to allow entities to implement the program that fits their needs and infrastructure. Some may be best suited to protect the data and others may be best suited in protecting the communication links. The security objects should remain as it is with options in how to achieve the objective as articulated in the draft guidance. 

    Elizabeth Axson, On Behalf of: Elizabeth Axson, , Segments 2

    - 0 - 0

     

    No – SMUD requests that the definition of communication links should be clarified.

     

    Joe Tarantino, On Behalf of: Sacramento Municipal Utility District - WECC - Segments 1, 3, 4, 5, 6

    - 0 - 0

    BPA does not agree that focusing on protection of the communication links is the best approach to meet the FERC directive. Merely protecting the network, or communications links, does not necessarily protect the data carried by the network.  However, if the requirement instead emphasizes protection of data, BPA believes entities will gain the additional benefit of creating a more secure cyber environment overall.

    BPA proposes that draft language be revised to require method(s) for protecting “applicable data” rather than “communication links” between Control Centers.

    Aaron Cavanaugh, On Behalf of: Bonneville Power Administration, WECC, Segments 1, 3, 5, 6

    - 0 - 0

    Gerry Adamski, On Behalf of: Gerry Adamski, , Segments 5

    - 0 - 0

    MMWEC supports comments submitted by APPA.

    David Gordon, On Behalf of: David Gordon, , Segments 5

    - 0 - 0

    The SDT should continue to evaluate multiple approaches to address the directive. Allowing the entity to determine which is appropriate based on situation. It might not be feasible to always implement link controls between entities.

    Amy Casuscelli, On Behalf of: Xcel Energy, Inc. - MRO, WECC, SPP RE - Segments 1, 3, 5, 6

    - 0 - 0

    Rather than focusing on the links, we should focus on protecting the data. If that means implementing certain protections such as encryption over the links, that's fine. Don't focus on the links themselves.

    Candace Morakinyo, On Behalf of: WEC Energy Group, Inc., MRO, RF, Segments 3, 4, 5

    - 0 - 0

    It is likely that the same types of logical controls would be utilized to protect either. It would be best to further the already established concept of protecting communication networks/links and explain how that, in turn, protects the data.

    Deborah VanDeventer, On Behalf of: Edison International - Southern California Edison Company, WECC, Segments 1, 3, 5, 6

    - 0 - 0

    Basin Electric prefers objective based standards/requirements.  If the objective can be met via multiple methods (e.g. protected communication links or protecting the data itself), Basin Electric would prefer the flexibility to choose the approach and method.  The proposal does include flexibitily within the protection of communication links approach which is appreciated.

    Mike Kraft, On Behalf of: Mike Kraft, , Segments 1, 3, 5, 6

    - 0 - 0

    Yes, Southern Company supports the SDTs approach focused on protection of communication links between Control Centers.  Additionally, Southern requests the SDT to consider the providing clarifying language that ensures the proper scoping of this Standard to be “communications between Control Centers” and exclude their associated data centers.  The definition of Control Center could inadvertently require additional protections be afforded to communications between an entity’s Control Centers and it’s own data centers, and that does not appear to be the intent stated in the FERC Order.

    Brandon Cain, On Behalf of: Southern Company - Southern Company Services, Inc., SERC, Segments NA - Not Applicable

    - 0 - 0

    See attachment Q1

    Daniel Gacek, On Behalf of: Exelon, , Segments 1, 3, 5, 6

    - 0 - 0

    Reclamation recommends including requirements for protecting communication networks in CIP-003-7i for low impact BES Cyber Systems, in CIP-005-5 for high and medium BES Cyber Systems, and in CIP-006-6 Requirement R1 Part 1.10 for physical security.

    Wendy Center, On Behalf of: U.S. Bureau of Reclamation, , Segments 1, 5

    - 0 - 0

    AECI agrees with the SDT's approach that the focus should be on the communication links rather than the sensitive BES data itself.

    Mark Riley, On Behalf of: Associated Electric Cooperative, Inc., , Segments 1, 3, 5, 6

    - 0 - 0

    1)      Recommend that the SDT focus on protecting the data for reliability and availability

    2)      We recommend that this Standard not prescribe the method for protecting the data but the objective of reliability and availability as the focus. Alternative approaches of application security or communication security controls should be allowed and clearly addressed in the Requirements.  The proposed procedures in Draft Language 1.1 and 1.2 would not be required.

    3)      FERC Order 822 section 58 clarifies this scope as inter-Control Center and intra-Control Center communications. The guidance seems to extend the scope beyond this

    4)      Recommend reviewing NIST Special Publication 800-47 which is titled Security Guideline for Interconnecting Information Technology Systems with a focus toward reliability and availability

    5)      The Standard should be an outcome based Standard.

     

    We like the option to protect either the data or the links.  We would like to see these options clearly defined within the requirements and not just in the guidance.  The Standard should be an outcome based Standard.

    FERC Order 822 section 58 clarifies this scope as inter-Control Center and intra-Control Center communications. The guidance seems to extend the scope beyond this by including references to DP’s and listing Data links without reference to Control Centers.

    RSC no Dominion, Segment(s) 1, 0, 2, 4, 5, 6, 7, 3, 3/13/2017

    - 0 - 0

    The review group recommends working on a multiple approach solution to address the directive. The Primary Solution could address the protection of the communication link. As an alternative method, we recommend the drafting team consider other methods that are not link level controls. Additionally, we would ask the drafting team to provide clarity on the difference between “communication links” and “communication networks”.

    SPP Standards Review Group, Segment(s) , 3/13/2017

    - 0 - 0

    What you are trying to protect data/link/network will ultimately determine how best to protect it, and it is not clear from this request what that is. 

    per the NSRF: The NSRF recommends focusing on the boundaries or interface points, not the links between control centers.  

    sean erickson, On Behalf of: Western Area Power Administration, , Segments 1, 6

    - 0 - 0

    We agree with focusing on the boundaries or interface points, not the links between control centers. 

    Charles Yeung, On Behalf of: Southwest Power Pool, Inc. (RTO), , Segments 2

    - 0 - 0

    Tacoma supports the comments of Utility Services, Inc

    Marc Donaldson, On Behalf of: Tacoma Public Utilities (Tacoma, WA), , Segments 1, 3, 4, 5, 6

    - 0 - 0

    Hot Answers

    Douglas Webb, On Behalf of: Great Plains Energy - Kansas City Power and Light Co., SPP RE, Segments 1, 3, 5, 6

    - 0 - 0

    AZPS does not agree with the security objective of the draft language as it is overly broad and extends beyond the scope of the directive set forth in Order 822 at Paragraph 53, which specifically targets data in transit between Control Centers. To the extent that this language is retained, AZPS recommends that the security objective be revised to state: 

    “…achieve the security objective to protect confidentiality and integrity of data communicated between bulk electric system Control Centers and the associated communication links…”

     

    Vivian Moser, On Behalf of: Vivian Moser, , Segments 1, 3, 5, 6

    - 0 - 0

    Other Answers

    Richard Kinas, On Behalf of: Richard Kinas, , Segments 3, 5

    - 0 - 0

    Entergy/NERC Compliance, Segment(s) 1, 5, 3/1/2017

    - 0 - 0

    Aaron Ghodooshim, On Behalf of: FirstEnergy - FirstEnergy Corporation, , Segments 1, 3, 4

    - 0 - 0

    DTE Energy - DTE Electric, Segment(s) 5, 4, 3, 2/27/2017

    - 0 - 0

    Glen Farmer, On Behalf of: Avista - Avista Corporation, , Segments 1, 3, 5

    - 0 - 0

    If the security objective is to protect the confidentiality and integrity of operational reliability data transmitted between control centers, the NSRF agrees

    MRO NSRF, Segment(s) 3, 4, 5, 6, 1, 2, 1/4/2017

    - 0 - 0

    SRP agrees with the security objective of protecting the confidentiality and integrity of data that is required for reliable operation and is transmitted between Control Centers. 

    Lona Calderon, On Behalf of: Salt River Project, WECC, Segments 1, 3, 5, 6

    - 0 - 0

    Mike Smith, On Behalf of: Manitoba Hydro , , Segments 1, 3, 5, 6

    - 0 - 0

    It is the Entity’s responsibility to protect its information systems, regardless of the origin of information that is fed info an information system. Specifically, the draft Guidance language directs REs to establish controls for data links between DPs and TOPs. In such a scenario, the DP may not be subject to any regulatory controls and the TOP has no mechanism to enforce what a DP is doing with their end of a communications link. Accordingly, the TOP is powerless to enforce end-to-end data link protections required by the draft language.

    In the event that an RE has the ability to control data-link security end-to-end with other entities, such a protection still provides no inherent cyber security benefit for the information carried over the data link; the information itself may contain a malicious payload carried over an otherwise trusted data-link.

    It is incumbent upon REs to configure information systems under their control to ensure that information provided to information systems is safe, trustworthy, and appropriately vetted; and potential for adverse impact of incomplete, untrustworthy, or malicious data has been appropriately mitigated. For example, on a Microsoft Windows server, the RE may install security patches that were downloaded from the public Internet. Such information is potentially adversely impactful to a BES Cyber System. However, the entity takes appropriate action to ensure the security patches are genuine. Even though communications links utilized for the vast majority of the transport are untrustworthy, appropriate application layer controls are leveraged to ensure the trustworthiness of the communications payload.

    Tennessee Valley Authority, Segment(s) 1, 3, 5, 6, 9/1/2016

    - 0 - 0

    Supporting APPA comments

    Seattle City Light Ballot Body, Segment(s) 1, 4, 6, 5, 3, 12/2/2016

    - 0 - 0

    Andrew Gallo, On Behalf of: Andrew Gallo, , Segments 1, 3, 4, 5, 6

    - 0 - 0

    We suggest "reliability and availability" replace "confidentiality and integrity" because EMS/SCADA systems are built on "reliability and availability." There should be flexibility when it comes to enforcing encryption and specifying methods and end points.

    Con Edison, Segment(s) 1, 3, 5, 6, 0, 6/24/2016

    - 0 - 0

    Duke Energy does not disagree with the security objective to protect confidentiality and integrity  of data required for reliable operation of the BES. We do not agree that the current draft language is measurable, and thus would make it difficult to audit. Moreoever, the draft language does not appear to fit the mold of other standards which are performance based. Also, more descriptive language needs to be placed in the requirement. Currently, as written, an entity would need to refer to the Guidelines and Technical Basis section to determine what was necessary to comply.

    Duke Energy , Segment(s) 1, 5, 6, 4/10/2014

    - 0 - 0

    PJM proposes that the objective should focus on protecting the communication networks.  Proposed language: “The Responsible Entity shall implement one or more documented plan(s) to protect data being transferred across communication networks between Control Centers, both inter-entity and intra-entity that include each of the applicable parts below:”

    The “Purpose” should include the security objective (confidentiality and integrity of data required for reliable operation of the BES).

    Preston Walker, On Behalf of: PJM Interconnection, L.L.C., SERC, RF, Segments 2

    - 0 - 0

    Lan Nguyen, On Behalf of: CenterPoint Energy Houston Electric, LLC, Texas RE, Segments 1

    - 0 - 0

    The security objective should be to protect the data.

    Jeff Johnson, On Behalf of: Sempra - San Diego Gas and Electric, WECC, Segments 1, 2, 3, 4, 5, 6, 7, 8

    - 0 - 0

    Lauren Price, On Behalf of: Lauren Price, , Segments 1

    - 0 - 0

    The security objective is not clearly stated. We recommend the drafting team put more emphasis or focus on the integrity of the data instead the confidentially. Additionally, we recommend a definition of data to be protected such as: Data if rendered unavailable, degraded, or misused within 15 minutes would adversely impact the Real-Time operation of the Bulk Electric System.  Does this mean that everytime you do a database change, that change control per the CIP standards must be utilized? (for example, if the database is degraded, it may have a 15 minute impact).

    Kara White, On Behalf of: NRG - NRG Energy, Inc., FRCC, MRO, WECC, Texas RE, NPCC, SERC, SPP RE, RF, Segments 3, 4, 5, 6

    - 0 - 0

    As it is understood, the objective is to ensure that data transmitted is received in a way that the recipient can be confident the data is complete and accurate.

    Laura Nelson, On Behalf of: Laura Nelson, , Segments 1

    - 0 - 0

    We suggest “reliability and availability” replace “confidentiality and integrity” because EMS/SCADA systems are built on “reliability and availability”. 

    Brian Evans-Mongeon, On Behalf of: Utility Services, Inc., , Segments 4

    - 1 - 0

    Propose deleting reference of confidentiality in the standard and focus on integrity because adding confidentiality expands the scope of the FERC Directive.

    Jason Snodgrass, On Behalf of: Jason Snodgrass, , Segments 1

    - 0 - 0

    Rachel Coyne, On Behalf of: Texas Reliability Entity, Inc., , Segments 10

    - 0 - 0

    Propose deleting reference of confidentiality in the standard and focus on integrity because adding confidentiality expands the scope of the FERC Directive.

    Guy Andrews, On Behalf of: Guy Andrews, , Segments 3, 4

    - 0 - 0

    Jamie Monette, On Behalf of: Allete - Minnesota Power, Inc., , Segments 1

    - 0 - 0

    Aaron Austin, On Behalf of: Aaron Austin, , Segments 3, 5

    - 0 - 0

    Anton Vu, On Behalf of: Los Angeles Department of Water and Power, , Segments 1, 3, 5, 6

    - 0 - 0

    PSEG REs, Segment(s) 5, 6, 3, 1, 3/6/2017

    - 3 - 0

    The commission is asking to implement controls to protect, at a minimum, the communication links and the data being communicated. The concepts introduced by the SDT (Confidentiality, Integrity, availability), are valid, but are not directly required by the commission. Also, the current CIPs do not mention those concepts. Either the requirements of the commission are updated or the SDT should fallback to the commission language.

    Si Truc Phan, On Behalf of: Hydro-Qu?bec TransEnergie, NPCC, Segments 1

    - 0 - 0

    In meeting the security triad of confidentiality, integrity, and availability, the security objective for availability is already addressed and monitored as noted under question 4. This requirement should be limited to the remaining two objectives of integrity and confidentiality. 

    Elizabeth Axson, On Behalf of: Elizabeth Axson, , Segments 2

    - 0 - 0

    Joe Tarantino, On Behalf of: Sacramento Municipal Utility District - WECC - Segments 1, 3, 4, 5, 6

    - 0 - 0

    BPA agrees with the security objective but suggests that the supporting language needs to be modified to support the objective of protecting data rather than emphasizing protection of communication links.  As discussed above, BPA also encourages the SDT to incorporate the requirements into existing CIP standards rather than creating a new standard.  Wherever the requirements reside, BPA proposes the following edits to the draft SDT language:

     

    The Responsible Entity shall implement one or more documented plan(s) that achieve the security objective to protect availability, confidentiality and integrity of data required for reliable operation of the BES. The plan applies to data being transferred across communication networks between Control Centers, both inter-entity and intra-entity and shall include each of the applicable parts below:

     

      1. Identification of the data required for reliable operation of the BES (if not already identified under IRO-010-2 and TOP-003-3);

      2. Method(s) for protecting applicable data between Control Centers identified in 1.1, where technically feasible.

      3. Loss of protection of data should be alarmed to a central location with a method of timely response.

    Aaron Cavanaugh, On Behalf of: Bonneville Power Administration, WECC, Segments 1, 3, 5, 6

    - 0 - 0

    Gerry Adamski, On Behalf of: Gerry Adamski, , Segments 5

    - 0 - 0

    MMWEC supports comments submitted by APPA.

    David Gordon, On Behalf of: David Gordon, , Segments 5

    - 0 - 0

    The language regarding physical security in the guidance section is concerning to Xcel Energy as physical security is not specifically referenced in the Standard or Requirement language. Cabling  within an ESP spanning multiple PSPs is already required to be physically secured (or deploy alternative measures such as encryption) under CIP-006-6 R1.10, so requiring this on all wiring would greatly increase the scope of cabling beyond what is needed under CIP v6.  If the SDT/FERC believes that all cabling in Control Centers need to be physically protected, then Xcel Energy would suggest the SDT update the existing language in CIP-006-6 R1.10 instead of through a new, separate, standard which raises the concern of double jeopardy and adds a new “spaghetti” requirement previously done away with by v5/v6.

     

    Xcel Energy suggests that the word ‘confidentiality’ be removed from draft language “The Responsible Entity shall implement one or more documented plan(s) that achieve the security objective to protect confidentiality and integrity of data required for reliable operation of the BES” to ensure consistency throughout the other CIP standards.

     

     

     

     

    Amy Casuscelli, On Behalf of: Xcel Energy, Inc. - MRO, WECC, SPP RE - Segments 1, 3, 5, 6

    - 0 - 0

    Yes, the primary objective should be on protecting the data.

    Candace Morakinyo, On Behalf of: WEC Energy Group, Inc., MRO, RF, Segments 3, 4, 5

    - 0 - 0

    In regards to the objectives, confidentiality and integrity have not been stated as explicit objectives in the current Standards, although they are obviously implied. The security objective should align with the current standards – “to protect against compromise that could lead to misoperation or instability in the BES.”

    Deborah VanDeventer, On Behalf of: Edison International - Southern California Edison Company, WECC, Segments 1, 3, 5, 6

    - 0 - 0

    Mike Kraft, On Behalf of: Mike Kraft, , Segments 1, 3, 5, 6

    - 0 - 0

    Southern Company agrees with the security objective of the draft language, but as previously stated, believes the language including the requirement to demonstrate confidentiality be removed.  Although confidentiality is part of the foundational CIA security triad, in most instances confidentiality does not have a real-time (<15 minute) impact to the reliability of the BES.

    Brandon Cain, On Behalf of: Southern Company - Southern Company Services, Inc., SERC, Segments NA - Not Applicable

    - 0 - 0

    See attachment Q1

    Daniel Gacek, On Behalf of: Exelon, , Segments 1, 3, 5, 6

    - 0 - 0

    Reclamation recommends adding the draft language to CIP-003-7i for low impact BES Cyber Systems, to CIP-005-5 for high and medium BES Cyber Systems, and to CIP-006-6 Requirement R1 Part 1.10 for physical security.

    Wendy Center, On Behalf of: U.S. Bureau of Reclamation, , Segments 1, 5

    - 0 - 0

    Mark Riley, On Behalf of: Associated Electric Cooperative, Inc., , Segments 1, 3, 5, 6

    - 0 - 0

    We suggest “reliability and availability” replace “confidentiality and integrity” because EMS/SCADA systems are built on “reliability and availability”.

    RSC no Dominion, Segment(s) 1, 0, 2, 4, 5, 6, 7, 3, 3/13/2017

    - 0 - 0

    The security objective is not clearly stated. We recommend the drafting team put more emphasis or focus on the integrity of the data instead of the confidentially. Additionally, we recommend a definition of the data to be protected such as: Data if rendered unavailable, degraded, or misused within 15 minutes would adversely impact the  Real-time operation of the Bulk Electric.

    SPP Standards Review Group, Segment(s) , 3/13/2017

    - 0 - 0

    sean erickson, On Behalf of: Western Area Power Administration, , Segments 1, 6

    - 0 - 0

    If the security objective is to protect the confidentiality and integrity of operational reliability data transmitted between control centers, we agree. 

    Charles Yeung, On Behalf of: Southwest Power Pool, Inc. (RTO), , Segments 2

    - 0 - 0

    Tacoma supports the comments of Utility Services, Inc

    Marc Donaldson, On Behalf of: Tacoma Public Utilities (Tacoma, WA), , Segments 1, 3, 4, 5, 6

    - 0 - 0

    Hot Answers

    We also believe sub Requirements 1.1 and 1.2 look as if they can be consolidated. Proposed language follows at the end of this response.

    Possible Alternative Language:

    R1. The Responsible Entity shall implement one or more documented plan(s) that achieve the security objective to protect confidentiality and integrity[1] of data required for reliable operation of the BES. The plan applies to data being transferred across communication networks between Control Centers, both inter-entity and intra-entity and shall include each of the applicable parts below:

    R1.1 Procedure(s) to identify networks requiring protections, and their associated boundaries.

    R1.2 Procedure(s) to associate the categorization completed under CIP-002-5.1a with the identified networks in R1.1.

    R1.3 Procedure(s) to design, construct, and implement protections for the networks identified in R1.1. The procedure shall be tailored to address the high, medium, and low impact risks associated with the networks in R1.2.

    R1.4 Procedure(s) to address protections for networks identified in R1.1 where technically feasible.

     

    [1]  NIST Special Publication 800-53A : Revision 4, Appendix B (Glossary) [NIST incorporates by reference the definition found in U.S. Code, Coordination of Federal Information Policy, Information Security  (44 U.S.C. §3542),  defining “integrity” as “Guarding against improper information modification or destruction, and includes ensuring information non-repudiation and authenticity.”]

    Douglas Webb, On Behalf of: Great Plains Energy - Kansas City Power and Light Co., SPP RE, Segments 1, 3, 5, 6

    - 0 - 0

    Please see the attached document for AZPS' comments regarding Question 8. 

    Vivian Moser, On Behalf of: Vivian Moser, , Segments 1, 3, 5, 6

    Project 2016-02 Communication Networks - Comment for Question 8.docx

    - 0 - 0

    Other Answers

    Richard Kinas, On Behalf of: Richard Kinas, , Segments 3, 5

    - 0 - 0

    Entergy/NERC Compliance, Segment(s) 1, 5, 3/1/2017

    - 0 - 0

    Aaron Ghodooshim, On Behalf of: FirstEnergy - FirstEnergy Corporation, , Segments 1, 3, 4

    - 0 - 0

    DTE Energy - DTE Electric, Segment(s) 5, 4, 3, 2/27/2017

    - 0 - 0

    Glen Farmer, On Behalf of: Avista - Avista Corporation, , Segments 1, 3, 5

    - 0 - 0

    The question assumes the development of a new standard.  The NSRF believes the objectives can be met through simple clarifying language in CIP-002 and CIP-006.  We believe the intent of the Order is met though other changes that have occurred in the standards over time.  Confidentiality is appropriately addressed through the NERC ORD Confidentiality Agreement.  The integrity of data is also addressed in multiple standards dealing with managing the quality of data used by operators (there are 136 references to data quality in the current set of standards). 

    MRO NSRF, Segment(s) 3, 4, 5, 6, 1, 2, 1/4/2017

    - 0 - 0

    Lona Calderon, On Behalf of: Salt River Project, WECC, Segments 1, 3, 5, 6

    - 0 - 0

    Mike Smith, On Behalf of: Manitoba Hydro , , Segments 1, 3, 5, 6

    - 0 - 0

    The responsibilities assigned to REs potentially cover information systems for which the RE has no control, creating compliance obligation that would be impossible to satisfy.

    Tennessee Valley Authority, Segment(s) 1, 3, 5, 6, 9/1/2016

    - 0 - 0

    Supporting APPA comments

    Seattle City Light Ballot Body, Segment(s) 1, 4, 6, 5, 3, 12/2/2016

    - 0 - 0

    Andrew Gallo, On Behalf of: Andrew Gallo, , Segments 1, 3, 4, 5, 6

    - 0 - 0

    Language should focus on data, not networks. There should be flexibility when it comes to enforcing encryption and specifying methods and end points.

    Con Edison, Segment(s) 1, 3, 5, 6, 0, 6/24/2016

    - 0 - 0

    Duke Energy suggests the drafting team consider the balance between existing CIP requirements, and the proposed requirement to protect and encrypt communication paths. There are existing CIP requirements in CIP-005-5 that certain communications links be inspected for malicious code for inbound and outbound communications. If a communication link is now expected to be encrypted, the ability to inspect the traffic for malicious code will not be feasible. If an entity determines that encryption is therefore not a possible option to be able to maintain compliance with existing requirements, the only suggested protection mechanism left would be physical and is not feasible in most situations.

    Duke Energy , Segment(s) 1, 5, 6, 4/10/2014

    - 0 - 0

    Preston Walker, On Behalf of: PJM Interconnection, L.L.C., SERC, RF, Segments 2

    - 0 - 0

    CenterPoint Energy has concerns with implementing methods for protecting communication links between Control Centers (R1.3) in situations where the end point is not owned by the entity.  What would be the compliance implications if the owner of the end point is not willing to implement protections?  CenterPoint Energy recommends that the drafting team provide guidance around ownership of communication links and how to comply with the requirement in these situations. 

    Lan Nguyen, On Behalf of: CenterPoint Energy Houston Electric, LLC, Texas RE, Segments 1

    - 0 - 0

           Delete 1.1

          1- Define the boundaries of communication networks transmitting data required for reliable operations. 2- Method(s) for protecting the in scope data between Control Centers where technically feasible.

    Jeff Johnson, On Behalf of: Sempra - San Diego Gas and Electric, WECC, Segments 1, 2, 3, 4, 5, 6, 7, 8

    - 0 - 0

    Lauren Price, On Behalf of: Lauren Price, , Segments 1

    - 0 - 0

    Kara White, On Behalf of: NRG - NRG Energy, Inc., FRCC, MRO, WECC, Texas RE, NPCC, SERC, SPP RE, RF, Segments 3, 4, 5, 6

    - 0 - 0

    It is important to maintain flexibility for Responsilbe Entities to develop controls that work best within their environment and for their situation. The less prescriptive the requirements, the more flexible and agile the Responsible Entity can be to work within the skills sets of their personnel and respond to the changing security and technology landscapes. IPC suggests that the requirements state objectives and requirements to document positions and controls and be less prescriptive than the CIP standards are in their current state.

    Laura Nelson, On Behalf of: Laura Nelson, , Segments 1

    - 0 - 0

    We like the option to protect either the data or the links.  We would like to see these options clearly defined within the requirements and not just in the guidance.  Replace “communication networks” with “communication networks or BES reliability data”.  Include in 1.1 that this is for networks or data between Control Centers.

     

    Brian Evans-Mongeon, On Behalf of: Utility Services, Inc., , Segments 4

    - 1 - 0

    Jason Snodgrass, On Behalf of: Jason Snodgrass, , Segments 1

    - 0 - 0

    Please see Texas RE’s comment in response to Question 6.

    Rachel Coyne, On Behalf of: Texas Reliability Entity, Inc., , Segments 10

    - 0 - 0

    Guy Andrews, On Behalf of: Guy Andrews, , Segments 3, 4

    - 0 - 0

    The openness left to entities allows flexible solutions that would be more appropriate than prescriptive requirements would allow.  This flexibility leaves concerns to what degree it would be audited to, this is similar to the Low Impact requirements.

    Jamie Monette, On Behalf of: Allete - Minnesota Power, Inc., , Segments 1

    - 0 - 0

    Aaron Austin, On Behalf of: Aaron Austin, , Segments 3, 5

    - 0 - 0

    Anton Vu, On Behalf of: Los Angeles Department of Water and Power, , Segments 1, 3, 5, 6

    - 0 - 0

    For requirement 1.3, we recommend adding the bulleted list from the Draft Guidance Section (similar to CIP-006-6 R1.10) into the requirement language. The requirement would be written as follows:

    1.3 Method(s) for protecting communication networks between Control Centers identified in 1.1, where technically feasible. The Responsible Entity  shall document and implement one or more of the following:

    • Site to site encryption;  or

    • Application layer encryption; or

    • Physical protections.

    PSEG REs, Segment(s) 5, 6, 3, 1, 3/6/2017

    - 3 - 0

    Si Truc Phan, On Behalf of: Hydro-Qu?bec TransEnergie, NPCC, Segments 1

    - 0 - 0

    ERCOT requests that the SDT also consider guidance on where parties at either end of a communication link are not in agreement. 

    Elizabeth Axson, On Behalf of: Elizabeth Axson, , Segments 2

    - 0 - 0

    Joe Tarantino, On Behalf of: Sacramento Municipal Utility District - WECC - Segments 1, 3, 4, 5, 6

    - 0 - 0

    Aaron Cavanaugh, On Behalf of: Bonneville Power Administration, WECC, Segments 1, 3, 5, 6

    - 0 - 0

    Gerry Adamski, On Behalf of: Gerry Adamski, , Segments 5

    - 0 - 0

    MMWEC supports comments submitted by APPA.

    David Gordon, On Behalf of: David Gordon, , Segments 5

    - 0 - 0

    This question can only be answered once a determination has been made as to whether a new standard is going to be created or updates are made to existing standards.

    Amy Casuscelli, On Behalf of: Xcel Energy, Inc. - MRO, WECC, SPP RE - Segments 1, 3, 5, 6

    - 0 - 0

    A CIP-005 requirement for physical protection or encryption of data flowing between ESPs associated with High and/or Medium Impact BES Cyber Systems should be sufficient to address this need.

    Candace Morakinyo, On Behalf of: WEC Energy Group, Inc., MRO, RF, Segments 3, 4, 5

    - 0 - 0

    Deborah VanDeventer, On Behalf of: Edison International - Southern California Edison Company, WECC, Segments 1, 3, 5, 6

    - 0 - 0

    Basin Electric would prefer the plans, procedures and methods be included in CIP-003 and CIP-005 as appropriate  vs.  in the new proposed standard CIP-012.

    Mike Kraft, On Behalf of: Mike Kraft, , Segments 1, 3, 5, 6

    - 0 - 0

    Brandon Cain, On Behalf of: Southern Company - Southern Company Services, Inc., SERC, Segments NA - Not Applicable

    - 0 - 0

    See attachment Q1

    Daniel Gacek, On Behalf of: Exelon, , Segments 1, 3, 5, 6

    - 0 - 0

    Wendy Center, On Behalf of: U.S. Bureau of Reclamation, , Segments 1, 5

    - 0 - 0

    Mark Riley, On Behalf of: Associated Electric Cooperative, Inc., , Segments 1, 3, 5, 6

    - 0 - 0

    We do not agree with the draft language which focuses on networks. This language should focus on data.

    We like the option to protect either the data or the links.  We would like to see these options clearly defined within the requirements and not just in the guidance.  Replace “communication networks” with “communication networks or BES reliability data”.  Include in 1.1 that this is for networks or data between Control Centers.

    RSC no Dominion, Segment(s) 1, 0, 2, 4, 5, 6, 7, 3, 3/13/2017

    - 0 - 0

    SPP Standards Review Group, Segment(s) , 3/13/2017

    - 0 - 0

    Referring to the protection of communication links, does this mean select individual links or does it really mean an entire network?  

    per the NSRF:The question assumes the development of a new standard.  The NSRF believes the objectives can be met through simple clarifying language in CIP-002 and CIP-006.  We believe the intent of the Order is met though other changes that have occurred in the standards over time.  Confidentiality is appropriately addressed through the NERC ORD Confidentiality Agreement.  The integrity of data is also addressed in multiple standards dealing with managing the quality of data used by operators (there are 136 references to data quality in the current set of standards).  

    sean erickson, On Behalf of: Western Area Power Administration, , Segments 1, 6

    - 0 - 0

    The question assumes the development of a new standard.  We believe the objectives can be met through simple clarifying language in CIP-002 and CIP-006.  We believe the intent of the Order is met though other changes that have occurred in the standards over time.  Confidentiality is appropriately addressed through the NERC ORD Confidentiality Agreement.  The integrity of data is also addressed in multiple standards dealing with managing the quality of data used by operators (there are 136 references to data quality in the current set of standards). 

    Charles Yeung, On Behalf of: Southwest Power Pool, Inc. (RTO), , Segments 2

    - 0 - 0

    Tacoma supports the comments of Utility Services, Inc

    Marc Donaldson, On Behalf of: Tacoma Public Utilities (Tacoma, WA), , Segments 1, 3, 4, 5, 6

    - 0 - 0

    Hot Answers

    We support a NERC Glossary Term for “Communication Network.”

    Suggested Definition

    Communication Network – Logical connections between two or more control centers which pass real time operational reliability data required for reliable operation of the Bulk Electric System.  The connections may include, but are not limited to, physical equipment, through tunneling, or other virtual constructs.

    Potential GTB support:  The Communication Network is a layer 3 (network layer) construct as established by the International Organization for Standardization (1989-11-15). "ISO/IEC 7498-4:1989 -- Information technology -- Open Systems Interconnection -- Basic Reference Model: Naming and

    Douglas Webb, On Behalf of: Great Plains Energy - Kansas City Power and Light Co., SPP RE, Segments 1, 3, 5, 6

    - 0 - 0

    AZPS recommended in its response to Question 8 that the term “communication networks” be replaced with the term “communication links.” AZPS recommends that the term “communication links” be defined as: 

    The logical communication path that uses a routable protocol to connect BES Control Centers and over which Sensitive BES Data is transmitted. 

    If the term “communication network” is retained, AZPS recommends the same definition: 

    The logical communication path that uses a routable protocol to connect BES Control Centers and over which Sensitive BES Data is transmitted. 

    Vivian Moser, On Behalf of: Vivian Moser, , Segments 1, 3, 5, 6

    - 0 - 0

    Other Answers

    Communication networks - Any technology that allows the transfer of information and data, including voice, between two endpoints.

    Richard Kinas, On Behalf of: Richard Kinas, , Segments 3, 5

    - 0 - 0

    Entergy/NERC Compliance, Segment(s) 1, 5, 3/1/2017

    - 0 - 0

    Does not need to be defined, because from a simple view it includes everything outside the CIP ESP.

    Aaron Ghodooshim, On Behalf of: FirstEnergy - FirstEnergy Corporation, , Segments 1, 3, 4

    - 0 - 0

    The collection of networked communication devices that provide routable transmission of data.

    DTE Energy - DTE Electric, Segment(s) 5, 4, 3, 2/27/2017

    - 0 - 0

    Glen Farmer, On Behalf of: Avista - Avista Corporation, , Segments 1, 3, 5

    - 0 - 0

    The term "communication networks" is used elsewhere in the standards. The NSRF believes that defining the term for one standard would have unintended impacts on other standards.

    MRO NSRF, Segment(s) 3, 4, 5, 6, 1, 2, 1/4/2017

    - 0 - 0

    Draft language, applicable part 1.1 call for procedure(s) to identify the communications network requiring protections.  A defined term for communication network may restrict an entity’s flexibility in determining how to implement the draft language.

    Lona Calderon, On Behalf of: Salt River Project, WECC, Segments 1, 3, 5, 6

    - 0 - 0

    Mike Smith, On Behalf of: Manitoba Hydro , , Segments 1, 3, 5, 6

    - 0 - 0

    TVA suggests focusing on the “sensitive bulk electric system data” moving between Control Centers and not underlying communications infrastructure.

    Tennessee Valley Authority, Segment(s) 1, 3, 5, 6, 9/1/2016

    - 0 - 0

    Supporting APPA comments

    Seattle City Light Ballot Body, Segment(s) 1, 4, 6, 5, 3, 12/2/2016

    - 0 - 0

    “A collection of interconnected components utilized for transmitting and/or receiving data.”

    Andrew Gallo, On Behalf of: Andrew Gallo, , Segments 1, 3, 4, 5, 6

    - 0 - 0

    CIP-002 Exemptions already utilize the "communications networks" term. However, consider that the FERC Order Section 58 clarifies the focus and the scope on inter-Control Center and intra-Control Center communications

    Con Edison, Segment(s) 1, 3, 5, 6, 0, 6/24/2016

    - 0 - 0

    Duke Energy supports a definition of “communication networks”. Use of the term “communication” creates some ambiguity, particularly what types of communication this applies. It is not known if all forms of communication fall under this purview, specifically verbal communication avenues.

    Duke Energy , Segment(s) 1, 5, 6, 4/10/2014

    - 0 - 0

    PJM asserts that “between Control Centers” already clarifies the scope.

    Preston Walker, On Behalf of: PJM Interconnection, L.L.C., SERC, RF, Segments 2

    - 0 - 0

    CenterPoint Energy recommends using the term “communication link(s)” instead of “communication networks” in the requirement language to align with the FERC directive.   The term “communication networks” can encompass many types of networks, some of which are currently out of scope for the CIP Standards.  CenterPoint Energy believes the focus should be on the protections around the communication links used to transmit sensitive bulk electric system data between Control Centers.  CenterPoint Energy recommends the following changes:

    “The Responsible Entity shall implement one or more documented plan(s) that achieve the security objective to protect confidentiality and integrity of data required for reliable operation of the BES. The plan applies to data being transferred across communication links between Control Centers, both inter-entity and intra-entity and shall include each of the applicable parts below:

    1.1       Procedure(s) to identify the communication links requiring protections;

    1.2       Procedure(s) for defining the boundaries of communication links transmitting data required for reliable operation identified in 1.1, if applicable;

    1.3       Method(s) for protecting communication links between Control Centers identified in 1.1, where technically feasible.”

    Lan Nguyen, On Behalf of: CenterPoint Energy Houston Electric, LLC, Texas RE, Segments 1

    - 0 - 0

    The standard uses two terms; "communication networks" and "communication links".  Use one term, not two.  We believe the standard should address securing the data, not the "networks" or "links".  

    Jeff Johnson, On Behalf of: Sempra - San Diego Gas and Electric, WECC, Segments 1, 2, 3, 4, 5, 6, 7, 8

    - 0 - 0

    Lauren Price, On Behalf of: Lauren Price, , Segments 1

    - 0 - 0

    NRG recommends that the SDT provide a defined term for “Communication Networks” into the the NERC GOT.

    Kara White, On Behalf of: NRG - NRG Energy, Inc., FRCC, MRO, WECC, Texas RE, NPCC, SERC, SPP RE, RF, Segments 3, 4, 5, 6

    - 0 - 0

    IPC suggests communication networks be defined as, "Those networks used to logically and physically transport a communications link."

    Laura Nelson, On Behalf of: Laura Nelson, , Segments 1

    - 0 - 0

    Recommend a NO vote on defining “communication network”

    But consider that the FERC Order Section 58 clarifies the focus and the scope on inter-Control Center and intra-Control Center communications

    Brian Evans-Mongeon, On Behalf of: Utility Services, Inc., , Segments 4

    - 1 - 0

    Proposed definition - Communication network is data link used to connect one location to another location for the purpose of transmitting and receiving digital data used in intra-Control Center communications for reliability operations of the BES.

    Jason Snodgrass, On Behalf of: Jason Snodgrass, , Segments 1

    - 0 - 0

    Texas RE would support the SDT in defining the term “communication networks”. 

     

    In addition, Texas RE recommends adding the following to the list of examples of communication links:

    Data link(s) between a Generator Operators.

    Rachel Coyne, On Behalf of: Texas Reliability Entity, Inc., , Segments 10

    - 0 - 0

    Proposed definition - Communication network is data link used to connect one location to another location for the purpose of transmitting and receiving digital data used in intra-Control Center communications for reliability operations of the BES.

    Guy Andrews, On Behalf of: Guy Andrews, , Segments 3, 4

    - 0 - 0

    The term “communication networks” is used elsewhere in the standards.  The NSRF believes that defining the term for one standard would have unintended impacts on other standards.

    Jamie Monette, On Behalf of: Allete - Minnesota Power, Inc., , Segments 1

    - 0 - 0

    AEP believes this will help define the extent of the requirements.

    Aaron Austin, On Behalf of: Aaron Austin, , Segments 3, 5

    - 0 - 0

    Anton Vu, On Behalf of: Los Angeles Department of Water and Power, , Segments 1, 3, 5, 6

    - 0 - 0

    We recommend the following definition: Communication Network: a system of sending and receiving information, i.e. data, from point A to point B using a network of logical and physical devices. The term ‘communication network’ excludes equipment facilities used exclusively for Interpersonal Communication or Alternative Interpersonal Communication, as defined in the NERC Glossary of Terms.

    PSEG REs, Segment(s) 5, 6, 3, 1, 3/6/2017

    - 3 - 0

    A definition of “communication networks” should be provided in the context of the CIP standard. This would minimize the risk of miss interpretation by the entities. In this case, we think that part of the definition should mention the logical network, not the physical network (not the equipment). So the definition could be logical network that is being used to transport data used by the BES

    Si Truc Phan, On Behalf of: Hydro-Qu?bec TransEnergie, NPCC, Segments 1

    - 0 - 0

    ERCOT asserts that “networks” may be too broad and implicate unintended equipment based on a common understanding of the term. Consider the use of “Communication Link” instead. Proposed definition: communications infrastructure between two or more locations for the purpose of transmitting and receiving data. 

    Elizabeth Axson, On Behalf of: Elizabeth Axson, , Segments 2

    - 0 - 0

    Yes – Clarity is always welcomed.

    Joe Tarantino, On Behalf of: Sacramento Municipal Utility District - WECC - Segments 1, 3, 4, 5, 6

    - 0 - 0

    Aaron Cavanaugh, On Behalf of: Bonneville Power Administration, WECC, Segments 1, 3, 5, 6

    - 0 - 0

    Gerry Adamski, On Behalf of: Gerry Adamski, , Segments 5

    - 0 - 0

    David Gordon, On Behalf of: David Gordon, , Segments 5

    - 0 - 0

    The term communication Networks has many different applications and is too broad of a term to be used in in Standard Language without adding a defined term in the NERC Glossary. The FERC directive only references “Links.” Xcel Energy would suggest formal definitions be drawn up for both Communication Networks and Links.

    Amy Casuscelli, On Behalf of: Xcel Energy, Inc. - MRO, WECC, SPP RE - Segments 1, 3, 5, 6

    - 0 - 0

    The SDT needs to make it clear whether there are deliniations / transitions between routable and other forms (serial, dial-up) forms of communication network. They should also make it clear what specific protections apply to those parts of the communication network over which a Registered Entity has direct control (up to and including the ESP) and those parts over which a Registered Entity may have little or no control (e.g. network communication links between ESPs).

    Candace Morakinyo, On Behalf of: WEC Energy Group, Inc., MRO, RF, Segments 3, 4, 5

    - 0 - 0

    If the term “communication networks” is not formally defined, industry interpretations will vary widely.

    Deborah VanDeventer, On Behalf of: Edison International - Southern California Edison Company, WECC, Segments 1, 3, 5, 6

    - 0 - 0

    Mike Kraft, On Behalf of: Mike Kraft, , Segments 1, 3, 5, 6

    - 0 - 0

    Southern Company respectfully requests that the SDT refrain from attempting to define “communications networks” as an attempt could be defined so broadly to open the door to varying degrees of interpretation, or alternatively a restrictive definition could place limitations on a Responsible Entity’s implementation.  The language, as specified in R1.2, places the responsibility on the Entity to define “the boundaries of communication networks transmitting data required for reliable operation” and should be determined by the Entity without the need for another defined term.

    Brandon Cain, On Behalf of: Southern Company - Southern Company Services, Inc., SERC, Segments NA - Not Applicable

    - 0 - 0

    See attachment Q1

    Daniel Gacek, On Behalf of: Exelon, , Segments 1, 3, 5, 6

    - 0 - 0

    To promote consistency as the standards change, Reclamation recommends NERC define “communication network” in the NERC Glossary of Terms.

    Reclamation recommends the following definition of Communication Network: “A system of communication connections consisting of (but not limited to) cables, fibers, microwave radio links, satellites, etc. used to connect computers or other terminals for the purpose of exchanging data required for the reliable operation of the BES.”

    Wendy Center, On Behalf of: U.S. Bureau of Reclamation, , Segments 1, 5

    - 0 - 0

    The term "communication networks" is already used in the applicability section of the CIP standards.  Defining this term could have unintended consequences.

    Mark Riley, On Behalf of: Associated Electric Cooperative, Inc., , Segments 1, 3, 5, 6

    - 0 - 0

    Recommend a NO vote on defining “communication network”.

    But consider that the FERC Order Section 58 clarifies the focus and the scope on inter-Control Center and intra-Control Center communications.

    RSC no Dominion, Segment(s) 1, 0, 2, 4, 5, 6, 7, 3, 3/13/2017

    - 0 - 0

    SPP Standards Review Group, Segment(s) , 3/13/2017

    - 0 - 0

    The document continually uses the terms, “communication links”, “communication networks”, “data links”, “in-scope communication networks”, “in-scope communication links”, and in one case “communication networks/data links”, without clarifying the differences between any of the terms, or their intended use.  This adds ambiguity to the document.  Questions surface regarding the nature of a link being a single path, and do multiple links form a network?  What is the difference between a communication link and a data link, does one carry voice traffic and the other does not?  Do “in-scope” vs. “not in-scope” links or networks need to be identified separately?  If the terms are being used interchangeably, then the correct term and its definition needs to be identified and used consistently.

    sean erickson, On Behalf of: Western Area Power Administration, , Segments 1, 6

    - 0 - 0

    The phrase “communication networks” is used elsewhere in the standards.  To define the term for one standard would have unintended impacts on other standards. 

    Charles Yeung, On Behalf of: Southwest Power Pool, Inc. (RTO), , Segments 2

    - 0 - 0

    Tacoma supports the comments of Utility Services, Inc

    Marc Donaldson, On Behalf of: Tacoma Public Utilities (Tacoma, WA), , Segments 1, 3, 4, 5, 6