This comment form is no longer interactive because the comment period is closed.

Regional Reliability Standard (Texas Reliability Entity) | BAL-001-TRE-2

Description:

Start Date: 11/22/2019
End Date: 01/06/2020

Associated Ballots:

Ballot Name Project Standard Pool Open Pool Close Voting Start Voting End

Filter:

Hot Answers

Teresa Krabe, On Behalf of: Lower Colorado River Authority, , Segments 1, 5

- 0 - 0

Comments on the technical aspects of the content of the requirements included should be sought and considered.   There needs to be a question on the merit, technical content, and material changes affecting those parties included in the requirements.     The changes to the combined cycle type of generating facility could go further to more accurately define the effective droop % expectations which include the relative sizes (MW ratings) of the generating resources and the composition the facility (ratio of # of combustion turbine generators to steam turbine generators, e.g. 1 on 1, 2 on 1, 3 on 1, etc.).   Both of these factors directly affect the effective % droop to be expected from the total facility where only the combustion turbines will respond to frequency disturbances.  The 5.78% effective droop included in the draft regional standard is not accurate for all facilities.    

Southern Company, Segment(s) 1, 6, 3, 5, 9/1/2016

- 0 - 0

Other Answers

Lee Maurer, On Behalf of: Oncor Electric Delivery, , Segments 1

- 0 - 0

Duke Energy, Segment(s) 1, 5, 6, 4/11/2019

- 0 - 0

Hot Answers

Teresa Krabe, On Behalf of: Lower Colorado River Authority, , Segments 1, 5

- 0 - 0

Southern Company, Segment(s) 1, 6, 3, 5, 9/1/2016

- 0 - 0

Other Answers

Lee Maurer, On Behalf of: Oncor Electric Delivery, , Segments 1

- 0 - 0

Duke Energy, Segment(s) 1, 5, 6, 4/11/2019

- 0 - 0

Hot Answers

Teresa Krabe, On Behalf of: Lower Colorado River Authority, , Segments 1, 5

- 0 - 0

Southern Company, Segment(s) 1, 6, 3, 5, 9/1/2016

- 0 - 0

Other Answers

Lee Maurer, On Behalf of: Oncor Electric Delivery, , Segments 1

- 0 - 0

Duke Energy, Segment(s) 1, 5, 6, 4/11/2019

- 0 - 0

Hot Answers

Teresa Krabe, On Behalf of: Lower Colorado River Authority, , Segments 1, 5

- 0 - 0

Southern Company, Segment(s) 1, 6, 3, 5, 9/1/2016

- 0 - 0

Other Answers

Lee Maurer, On Behalf of: Oncor Electric Delivery, , Segments 1

- 0 - 0

Duke Energy, Segment(s) 1, 5, 6, 4/11/2019

- 0 - 0

Hot Answers

Teresa Krabe, On Behalf of: Lower Colorado River Authority, , Segments 1, 5

- 0 - 0

Southern Company, Segment(s) 1, 6, 3, 5, 9/1/2016

- 0 - 0

Other Answers

Lee Maurer, On Behalf of: Oncor Electric Delivery, , Segments 1

- 0 - 0

Duke Energy, Segment(s) 1, 5, 6, 4/11/2019

- 0 - 0